AB 1632 Nuclear Assessment Documents Page
Docket # 07-AB-1632

Most files are Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site. Some PDF files are very large. Download these directly to your computer's hard drive by "right-clicking" the link to the file (use option-mouse click if on a Macintosh). After the file is downloaded, open it through Acrobat Reader.

Workshops & Meetings

(Listed with newest date at top. Links to section below.)

  • November 20, 2008 - Business Meeting Adoption of the AB1632 Assessment
  • October 20, 2008 - Committee Workshop and Report Availability Assembly Bill 1632 Nuclear Power Plant Assessment
  • September 25, 2008 - Joint Committee Workshop on the AB 1632 Nuclear Power Plant Assessment
  • December 12, 2007 - Commission Workshop on the AB 1632 Nuclear Power Plant Assessment
  • December 10, 2007 - Senate Committee on Energy, Utilities and Communications - Informational Hearing on Nuclear Power Plant Issues

Proceeding Documents

Final Reports


An Assessment of California's Nuclear Power Plants, Commission Report, adopted November 20, 2008.
Publication # CEC-100-2008-009-CMF.
(PDF file, 52 pgs., 920 kb), posted: November 25, 2008

AB 1632 Assessment of California's Operating Nuclear Plants - FINAL Consultant Report, publication # CEC-100-2008-005-F.
Posted 10/24/08. (Acrobat PDF file, 330 pages, 3.7)

Appendices of FINAL Consultant Report, publication # CEC-100-2008-005-F-AP. Posted 10/24/08. (Acrobat PDF file, 164 pages, 1.0 megabytes)



An Assessment of California's Nuclear Power Plants: AB 1632 Committee Final Report
publication # CEC-100-2008-009-CTF, posted October 31, 2008. (PDF file, 48 pgs, 2.7 mb)

An Assessment of California's Operating Nuclear Plants - AB 1632 Draft Committee Report
Posted 10/30/08. (Acrobat PDF file, 50 pages, 807 kb)

AB 1632 Assessment of California's Operating Nuclear Plants - Draft Consultant Report
Posted 9/12/08. (Acrobat PDF file, 326 pages, 3.7)

Appendices of Draft Consultant Report. Posted 9/12/08. (Acrobat PDF file, 145 pages, 1.4 megabytes)


AB 1632 Nuclear Power Plant Assessment - Study Plan
Posted 1/30/08. (Acrobat PDF file, 18 pages, 72 kilobytes)



November 20, 2008
Business Meeting Adoption of the AB1632 Assessment



October 20, 2008
Committee Workshop and Committee Report Availability Assembly Bill 1632 Nuclear Power Plant Assessment




September 25, 2008
Joint Committee Workshop on the AB 1632 Nuclear Power Plant Assessment




December 12, 2007
Commission Workshop on the AB 1632 Nuclear Power Plant Assessment




Background Documents


December 10, 2007
Senate Committee on Energy, Utilities and Communications - Informational Hearing on Nuclear Power Plant Issues
Note: this is not part of the Energy Commission's AB 1632 proceeding. It is being posted here for informational purposes.

CalTrans Headquarters
Garcia Auditorium
4050 Taylor Street
San Diego
1 p.m. to 4 p.m.

Agenda and Presentations

Testimony by James D. Boyd Vice Chairman of the California Energy Commission, (PDF file, 7 pgs., 76 kb)


Assembly Bill 1632. (PDF file, 3 pages, 76 kilobytes)

Integrated Energy Policy Reports (2003-2007)

Nuclear Power in California: 2007 Status Report - FINAL Consultant Report, publication # CEC-100-2007-005-F. October 17, 2007.
(PDF file, 332 pages, 4.4 megabytes)

Nuclear Power in California: 2005 Status Report - FINAL Consultant Report, publication # CEC-100-2006-001-F. March 7, 2006.
(PDF file, 148 pages, 2.7 megabytes)