Status of All Projects

Download this information as an Excel file (144 kb).

CALIFORNIA ENERGY COMMISSION - ENERGY FACILITY STATUS
Power Plant Projects Since 1996, Updated:
  COLOR KEY:
  Operational / On Line
  Approved
  In Review
  On-line date is expected to be delayed beyond the date shown.
  Expected and disclosed
  Planned but undisclosed
  On hold or suspended. According to developers,
the new on-line date will be determined when the markets are favorable and financing is available.
  Project approved but cancelled by applicant or approved and license expired before construction began; or proceeding terminated by Commission.

  Projects On Line
Arranged by
Date On Line
Docket
Number
Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction Start Date Original
On-Line Date
Actual
On-Line Date*
1a Sunrise - Texaco & Edison Mission E. 98-AFC-4 Operational 320 100 Kern Co. 12/6/00 12/7/00 7/01 6/27/01
2 Sutter - Calpine 97-AFC-2 Operational 540 100 Sutter Co. 4/14/99 7/1/99 7/01 7/2/01
3 Los Medanos (Pittsburg) - Calpine 98-AFC-1 Operational 555 100 Contra Costa 8/17/99 9/17/99 7/01 7/9/01
4 Wildflower Larkspur - Intergen 01-EP-1 Operational 90 100 San Diego Co. 4/4/01 4/5/01 7/01 7/16/01
5 Wildflower Indigo 1,2&3 - Intergen 01-EP-2 Operational 135 100 Riverside Co. 4/4/01 4/5/01 7/01-9/01 7/26-9/10/01
6 Drews - Alliance 01-EP-5 Operational 40 100 San Bernardino 4/25/01 4/26/01 9/01 8/15/01
7 Hanford - GWF 01-EP-7 Operational 95 100 Kings Co. 5/10/01 5/11/01 9/01 9/1/01
8 Century - Alliance 01-EP-4 Operational 40 100 San Bernardino 4/25/01 4/26/01 9/01 9/15/01
9 Escondido - Calpeak 01-EP-10 Operational 49.5 100 San Diego Co. 6/6/01 6/7/01 9/01 9/30/01
10 Border - Calpeak 01-EP-14 Operational 49.5 100 San Diego Co. 7/11/01 7/12/01 9/01 10/26/01
  Subtotal On Line 2001 1,914            
11 Gilroy I, Units 1,2&3 - Calpine 01-EP-8 Operational 135 100 Santa Clara Co. 5/21/01 5/22/01 9/01 Units 1&2: 1/29/02
Unit 3: 2/20/02
12 King City - Calpine 01-EP-6 Operational 50 100 Monterey Co. 5/2/01 5/3/01 9/01 1/14/02
13 Delta - Calpine 98-AFC-3 Operational 887 100 Contra Costa 2/9/00 4/1/00 7/02 5/10/02
14 Henrietta Peaker - GWF 01-AFC-18 Operational 96 100 Kings Co. 3/7/02 3/8/02 6/02 7/1/02
15 Moss Landing Unit 1 & 2 - Duke 99-AFC-4 Operational 1,060 100 Monterey Co. 10/25/00 11/28/00 6/02 7/11/02
16 Huntington Beach Unit 3 & 4 - AES 00-AFC-13 Operational 450 100 Orange Co. 5/10/01 5/31/01 11/01 Unit 3: 7/31/02
Unit 4: 8/7/03
17a Valero Cogen. Unit 1 01-AFC-5 Operational 51 100 Solano Co. 10/31/01 11/5/01 6/02 10/18/02
  Subtotal On Line 2002 2,729            
18 La Paloma - PG&E Natl. Units 1, 2, 3 & 4 98-AFC-2 Operational 1,124 100 Kern Co. 10/6/99 1/1/00 3/02 Units 1&2: 1/10/03
Units 3&4: 3/7/03
19 Los Esteros 1 - Calpine Units 1, 2, 3 & 4 01-AFC-12 Operational 180 100 Santa Clara Co. 7/2/02
Recertified
3/16/05
Under docket
03-AFC-2
7/8/02 5/03 3/7/03
20 High Desert - Constellation 97-AFC-1 Operational 830 100 San Bernardino 5/3/00 5/1/01 7/03 4/22/03
21 Tracy Peaker - GWF 01-AFC-16 Operational 169 100 San Joaquin Co. 7/17/02 7/22/02 4/03 6/1/03
1b Sunrise Comb. Cycle - Texaco & Mission (amendment to application: 98-AFC-4) 98-AFC-4C Operational 265 100 Kern Co. 11/19/01 12/21/01 6/03 6/1/03
22 Woodland II Combined Cycle - Modesto Irrigation District 01-SPPE-1 Operational 80 100 Stanislaus Co 9/19/01 2/21/02 5/03 6/6/03
23 Blythe I - Blythe Energy, LLC 99-AFC-8 Operational 520 100 Riverside Co. 3/21/01 4/27/01 4/03 7/15/03
24 Elk Hills - Sempra & Oxy 99-AFC-1 Operational 500 100 Kern Co. 12/6/00 6/8/01 12/02 7/24/03
  Subtotal On Line 2003 3,668            
  Subtotal On Line 2004 0            
25 Donald Von Raesfeld Power Plant Project (Formerly Pico Power) Combined Cycle - Silicon Valley Power 02-AFC-3 Operational 147 100 Santa Clara Co. 9/9/03 9/10/03 12/04 3/24/2005
26 Pastoria Phase 1, Unit 1, 2 & 3 - Calpine 99-AFC-7 Operational 750 99 Kern Co. 12/20/00 10/3/01 1/03 Unit 1: 5/4/05
Units 2&3: 7/5/05
27 Metcalf - Calpine 99-AFC-3 Operational 600 100 Santa Clara Co. 9/24/01 1/15/02 7/03 5/27/05
28 Kings River Conservation Dist. Peaker 03-SPPE-2 Operational 97 100 Fresno Co. 5/19/04 11/04 5/05 9/19/05
29 Magnolia - SoCal Power Authority 01-AFC-6 Operational 328 100 Los Angeles Co. 3/5/03 7/21/03 5/05 9/22/05
30 Malburg - City of Vernon Combined Cycle 01-AFC-25 Operational 134 100 Los Angeles Co. 5/20/03 9/11/03 11/05 10/17/05
31a Mountainview Units 3 & 4 - SCE 00-AFC-2 Operational 1,056 100 San Bernardino 3/21/01 9/1/01
Resumed: 3/15/04
6/03 Unit 3: 12/9/05
Unit 4: 1/19/06
  Subtotal On Line 2005 3,112            
32 SMUD Cosumnes Combined Cycle Phase 1 - SMUD 01-AFC-19 Operational 500 100 Sacramento Co. 9/9/03 9/17/03 6/05 2/24/06
33 Walnut Energy Center - Turlock Irrigation District 02-AFC-4 Operational 250 100 Stanislaus Co 2/18/04 3/15/04 4/06 2/28/06
34 Palomar Escondido - Sempra 01-AFC-24 Operational 546 100 San Diego Co. 8/6/03 6/1/04 3/06 4/1/06
35 Riverside Energy Resource Center Units 1 & 2 - City of Riverside 04-SPPE-1 Operational 96 100 Riverside Co. 12/15/04 2/23/05 6/05 Unit 1: 6/1/06
Unit 2: 7/26/2006
36 Ripon Simple Cycle - MID 03-SPPE-1 Operational 95 100 San Joaquin Co. 2/4/04 10/4/04,
Restart
4/1/05
4/05 6/21/06
  Subtotal On Line 2006 1,487            
37 Bottle Rock Geothermal - U.S. Renewables Group 79-AFC-4C
Amendment
Operational 17 100 Lake Co. 12/13/06 12/19/06 6/07 10/1/07
38 Roseville Combined Cycle - Roseville 03-AFC-1 Operational 160 100 Placer Co. 4/13/05 8/18/05 12/07 11/5/07
  Subtotal On Line 2007 177            
39 Niland Peaker - Imperial Irrigation District 06-SPPE-1 Operational 93 100 Imperial Co. 10/11/06 6/25/07 5/08 5/29/08/
  Subtotal On Line 2008 93            
40 Gateway - PG&E
(formerly Contra Costa - Mirant)
00-AFC-1 Operational 530 100 Contra Costa 5/30/01 8/30/01
Resumed: 2/2007
8/03 1/4/09
41a Inland Empire Comb Cycle - GE & Calpine {5} (UNIT 1) 01-AFC-17 Operational 400 100 Riverside Co. 12/17/03 8/29/05 12/05 Unit 1: 1/28/09
400 MW
42 Starwood Midway - Starwood Power-Midway LLC 06-AFC-10 Operational 120 100 Fresno Co. 1/16/08 9/23/08 6/09 5/1/09
43 EIF Panoche - Energy Investors Fund 06-AFC-5 Operational 400 100 Fresno Co. 12/19/07 2/15/08 11/09 7/1/09
44 Otay Mesa - Calpine 99-AFC-5 Operational 590 100 San Diego Co. 4/18/01 Began: 9/10/01
Restart: 6/21/04
Resumed: 5/1/07
7/03 10/3/09
  Subtotal On Line 2009 2,040            
41b Inland Empire Comb Cycle - GE & Calpine {5} (UNIT 2) 01-AFC-17 Operational 400 100 Riverside Co. 12/17/03 8/29/05 12/05 Unit 2: 5/3/2010
45 Orange Grove Energy - J Power USA 08-AFC-4 Operational 96 100 San Diego Co. 4/8/09 7/16/2009 12/10 4/10
Blythe I Transmission Line - Blythe Energy, LLC 99-AFC-8C Operational 115 kV
Transmission
Line
100 Riverside Co. 10/11/06 2/23/09 6/07 4/2010
46 Humboldt Bay Generating Station - PG&E 06-AFC-7 Operational 163 100 Humboldt Co. 9/24/08 10/11/08 9/09 10/1/2010
47 Colusa Generation Station - E&L Westcoast 06-AFC-9 Operational 660 100 Colusa Co. 4/23/08 7/28/08 5/10 12/22/2010
  Subtotal On Line 2010 1319            
48 Riverside Energy Resource Center Expansion, Units 3&4 - City of Riverside 08-SPPE-1 Operational 96 100 Riverside Co. 2/25/09 1/4/10 12/09 11/2010
  Subtotal On Line 2011 96            
  ON-LINE TOTAL 16,635            



  Approved and/or Under Construction
(Arranged By Date Approved)
Docket Number Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction
Start Date
Original
On-Line Date
Current
On-Line Date*
1 Los Esteros Combined Cycle - Calpine 2003-AFC-2C Under Construction 140 10 Santa Clara 10/11/2006 5/26/2011 N/A N/A
2 El Centro Unit 3 Repower - IID 2006-SPPE-2C Under Construction 85 15 Imperial 1/4/2011 9/2010 4/2012 N/A
3 Russell City - Calpine & GE 2001-AFC-7C Under Construction 600 11 Alameda 10/03/2007 9/1/2010 2013 7/2013
4 Walnut Creek Peaker - Edison Mission E. 2005-AFC-2C Under Construction 500 1 Los Angeles 2/27/2008 6/2011 N/A N/A
5 Victorville Hybrid Gas-Solar - City of Victorville 2007-AFC-1C pre-Construction 563 0 San Bernardino 7/16/2008 Unknown 8/2010 Unknown
6 Avenal Energy - Avenal Power Center, LLC 2008-AFC-1C pre-Construction 600 0 Kings 12/16/2009 7/2011 12/2011 6/2012
7 Canyon Power Plant - City of Anaheim 2007-AFC-9C Under Construction 200 93 Orange 3/17/2010 4/15/2010 7/2011 7/2011
8 Hanford Combined-Cycle Power Plant (Hanford Energy Peaker Project Expansion) - GWF Energy LLC 2001-EP-7C pre-Construction 25 0 Kings 3/24/2010 9/2011 10/2012 2/2013
9 Henrietta Peaker Project Combined Cycle Expansion - GWF Energy LLC 2001-AFC-18C pre-Construction 25 0 Kings 3/24/2010 9/2011 10/2012 2/2013
10 Tracy Combined Cycle - GWF 2008-AFC-7C Under Construction 145 39.6 San Joaquin 3/24/2010 1/10/2011 2013 N/A
11 Lodi Energy Center - NCPA 2008-AFC-10C Under Construction 255 69 San Joaquin 4/21/2010 7/14/2010 6/2012 6/2012
12 El Segundo Power Redevelopment (Dry Cooling Amendment) 2000-AFC-14C Under Construction 630 2 Los Angeles 7/1/2014 5/6/2011 8/2010 8/2013
13 Beacon Solar Energy Project - Beacon Solar LLC 2008-AFC-2C pre-Construction 250 0 Kern 8/25/2010 9/2010 N/A N/A
14 Marsh Landing Generating Station 2008-AFC-3C Under Construction 760 5 Contra Costa 8/25/2010 1/15/2010 6/2013 9/2013
15 Abengoa Mojave Solar Project - Mojave Solar LLC 2009-AFC-5C pre-Construction 250 0 San Bernardino 9/8/2010 N/A N/A N/A
16 Solar Millennium Blythe - Solar Millennium 2009-AFC-6C Under Construction 1000 1 Riverside 9/15/2010 11/4/2010 N/A 2015
17 Ivanpah Solar - Brightsource 2007-AFC-5C Under Construction 370 7 San Bernardino 9/22/2010 10/2010 10/2012 - 2014 10/2012 - 2014 Phased
18 Genesis Solar Energy Project - NextEra Energy 2009-AFC-8C Under Construction 250 .10 Riverside 9/29/2010 1/17/2011 N/A N/A
19 Calico Solar - Calico Solar LLC (formerly SES Solar One LLC/Stirling Energy 2008-AFC-13C pre-Construction 663.5 0 San Bernardino 10/28/2010 6/2012 N/A N/A
20 Sentinel Peaker - CPV 2007-AFC-3C Under Construction 850 1 Riverside 12/1/2010 6/2011 8/2013 8/2013
21 Almond Peaker Power Plant Project - Turlock Irrigation District 2009-AFC-2C Under Construction 174 45 Stanislaus 12/16/2014 3/1/2011 3/27/2012 6/2012
22 Rice Solar Energy Project - Rice Solar Energy LLC / SolarReserve LLC 2009-AFC-10C pre-Construction 150 0 Riverside 12/16/2014 9/2011 N/A N/A
23 Solar Millennium Palen - Solar Millennium 2009-AFC-7C pre-Construction 500 0 Riverside 12/16/2014 9/2010 N/A N/A
24 Mariposa Peaker Project - Diamond Energy 2009-AFC-3C Under Construction 200 10 Alameda 5/18/2011 6/8/2011 2012 2012
25 Oakley Generating Station (formerly Contra Costa) 2009-AFC-4C Under Construction 624 5 Contra Costa 5/18/2011 6/8/2011 2013 2012
26 Hybrid Gas-Solar - City of Palmdale (520 MW gas, 50 MW solar) 08-AFC-9 Under Construction 570 0 Los Angeles Co. 8/4/08 7/27/2011   2013
  Approved and/or Under Construction Subtotal

10.379.5

           
  Approved & On Hold - Not Under Construction
(Arranged By On-Line Date)
Docket Number Status Capacity (MW) Construction Completed
(percent)
Location Date Approved Construction
Start Date
Original
On-Line Date
Current
On-Line Date*
1 Morro Bay - L.S. Power {1} 2000-AFC-12C On Hold 1,200 0 San Luis Obispo 8/2/2004
Note:Commission decision not finalized pending NPDS permit.
On Hold On Hold On Hold
2 Pastoria Phase 2 Expansion Project - simple cycle addition - Calpine 2005-AFC-1C On Hold 160 0 Kern Co. 11/8/06 On Hold   On Hold
3 Black Rock 1, 2, and 3 Geothermal Power Project
(Formerly Salton Sea Geothermal) {4}
2002-AFC-2C On Hold 159 0 Imperial Co. 12/17/03 License Expires on 12/18/2011, On Hold, Extension Needed N/A On Hold
4 Blythe II Combined Cycle - Blythe Energy, LLC 02-AFC-1 On Hold 520 0 Riverside Co. 12/14/05 On Hold   On Hold
  Subtotal Approved and "Available" for Construction 2,039            
A Tesla Combined Cycle - FPL 2001-AFC-21C Not Built and License Expired 1,120 0 Alameda Co. 6/16/2004 Cancelled N/A Not built and License Expired
B San Joaquin Valley Energy Center - Calpine 2001-AFC-22C Not built and License Expired 1,087 0 Fresno Co. 1/14/2004 Cancelled 1/2006 Not built and License Expired
C Three Mountain - Covanta 1999-AFC-2C Not built and License Expired 500 0 Shasta Co. 5/16/2001 Cancelled 12/2003 Not built and License Expired
D Western Midway-Sunset - Mission 1999-AFC-9C Not built and License Expired 500 0 Kern Co. 3/21/2001 Cancelled 7/2003 Not built and License Expired
E United Golden Gate Phase 1 - El Paso 2000-AFC-5C Not built and License Expired 51 0 San Mateo Co. 3/7/2001 Cancelled 7/2001 Not built and License Expired
F Pegasus Energy - Delta Power 2001-EP-9C Cancelled 181 0 San Bernardino 6/6/2001 Cancelled Cancelled Cancelled
G Chula Vista 2 - Ramco 2001-EP-3C Cancelled 62 0 San Diego Co. 6/13/2001 Cancelled Cancelled Cancelled
H Hanford Energy Park - GWF {3} 2000-SPPE-1C Cancelled 99 0 Kings Co. 4/11/2001 Cancelled Cancelled Cancelled
I Valero Cogen. (Unit 2)
(see Unit 1 - # 17a in "On Line" section)
2001-AFC-5C Not built and License Expired 51 37 Solano Co. 10/31/2001 2/1/2007 12/2002 Not built and License Expired
J San Francisco Reliability Project - City of SF 2004-AFC-1C License Terminated 145 0 San Francisco 10/3/2006   12/2008 License Terminated
K East Altamont - Calpine 2001-AFC-4C License Terminated 1,100 0 Alameda Co. 8/20/03 8/2011 7/05 License Terminated
L Imperial Valley Solar (Formerly SES Solar Two) - Imperial Valley Solar LLC 2008-AFC-5C License Terminated 709 0 Imperial 9/29/2010 N/A N/A License Terminated
  Subtotal Approved but Will Not Be Built 5,605            
  Subtotal Approved AND Not Under Construction 7,644            
  APPROVED TOTAL 34,658.5            



  Projects Not Approved Docket Number Process Capacity (MW) Project Type Location Date Filed Decision Date    
Eastshore Energy Center - Eastshore Energy, LLC / Tierra Energy 06-AFC-6 12-mo. AFC 116 Brown Field Alameda Co. 9/22/06 PROJECT
DENIED
10/8/08
   
MMC Chula Vista Expansion - MMC Energy Inc. 07-AFC-4 12-mo. AFC 100 Brown Field
Replacement
San Diego Co. 8/10/07 PROJECT
DENIED
6/17/09
   
AES High Grove Power Plant 06-AFC-2 12-mo. AFC 300 Brown Field San Bernardino Co. 5/25/06 PROJECT
WITHDRAWN
2/4/10
   
  DENIED TOTAL 516            



  Projects in Review
(Arranged Alphabetically )
Docket Number Process Capacity (MW) Project Type Location Date Filed Estimated Decision Date   Estimated
On-line Date**
1 Carlsbad - NRG 07-AFC-6 12-month AFC 558 Brown Field San Diego Co. 9/14/07 6/30/2011   7/10
2 Clean Hydrogen Energy California - Hydrogen Energy International LLC 08-AFC-8 12-month AFC 390 Brown Field Kern Co. 7/31/08
Revised AFC filed
5/28/09
TBD   TBD
3 CPV Vaca-Station - CPV Vacaville LLC 08-AFC-11 12-month AFC 660 Green Field Solano Co. 11/18/08 On Hold   TBD
4 HIdden Hills Solar Electric Generating System - BrightSource Energy, Inc. 11-AFC-2 12-month AFC 500 Green Field Inyo Co. 8/5/11 8/5/2012   TBD
6 Pio Pico Energy Center - Pio Pico Energy Center LLC 11-AFC-1 12-month AFC 300 Green Field San Diego Co. 2/9/2011 TBD   TBD
7 Quail Brush Generating Project
Quail Brush Genco, LLC.
2011-AFC-03 12-month AFC 100 Green Field San Diego Co. 8/2011      
8 Sun Valley Energy Project (simple cycle/peaker) - Edison Mission Energy 05-AFC-3 12-month AFC 500 Green Field Riverside Co. 12/1/05 On Hold   TBD
9 Watson Cogeneration Steam and Electric Reliability Project 09-AFC-1 12-month AFC 85 Brown Field Los Angeles Co. 3/19/09 TBD   TBD
10 Willow Pass Generating Station - Mirant 08-AFC-6 12-month AFC 550 Brown Field Contra Costa Co. 6/30/08 On Hold   TBD
a San Gabriel Generating Station - Reliant 07-AFC-2 12-month AFC [656] Brown Field San Bernardino Co. 4/13/07 Suspended During Review   Suspended During Review
b Solar Millennium Ridgecrest - Solar Millennium (solar thermal) 09-AFC-9 12-month AFC [250] Green Field Kern Co. 9/1/09 Suspended During Review   Suspended During Review
  UNDER REVIEW TOTAL
(Excludes Suspended)
2,737            



  Projects Announced
(Arranged By Estimated Filing Date)
Process Plant type Capacity (MW) Project Type Location Estimated Filing Date      
1 Black Rock 5 & 6 Geothermal Power Project
CE Butte Energy, LLC.
12-month AFC Geothermal Steam Turbine 235 Green Field Imperial Co. 11/2011      
2 Rio Mesa Solar Electric Generating Facility
BrightSource Energy
12-month AFC Power Tower 750 Green Field Riverside Co. 11/2011      
  ANNOUNCED TOTAL 985            



   
  NOTES:   DEFINITIONS:
  Bold text in table identifies a change from the previous report. Green Field - undeveloped site
  * Estimated on-line date if construction is not delayed. Brown Field - developed site
  ** Estimated on-line date if approved and constructed as proposed. Expansion - New unit at existing power plant site, no loss of existing generation
  Projects in italics are emergency siting projects. Repower - Modification of existing equipment
  Megawatts in [ ] are not included in totals. Replacement - Demolition of old plant and construction of new plant
  {1} 1002 MW replaced with 1200 MW for a net increase of 198 MW On Hold indicates the applicant has suspended work.
  {2} 339 MW replaced with 630 MW for a net increase of 291 MW Suspended indicates the committee has suspended the proceeding.
  {3} Calpine has received Commission approval to amend the project to add "duct firing," thereby increasing the total generating capacity from 510 to 590 MW.
  {4} Amendment Approved 2/2/2011.
  {5} Total MW includes 130 MW amendment approved 6/22/05.
  {6} Calpine needs to obtain a new or amended Commission decision for a new location for the Russell City Project (01-AFC-7) approved September 11, 2002, but since "on hold."
  {7} El Centro project (06-SPPE-2) is repower of 44 MW Unit 3 at Imperial Irrigation District El Centro Generating Station with 128 MW new facility, for a net increase of 84+ MW.
  MW for projects withdrawn, cancelled or expired are not included in total available for possible construction.
 
 