Welcome to the California Energy Commission

Palomar Energy Center Power Plant Licensing Case
Documents Page



IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.



Docket Number: 01-AFC-24

Most files are Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

Some PDF files are very large. Download these directly to your computer's hard drive by "right-clicking" the link to the file (use option-mouse click if on a Macintosh). After the file is downloaded, open it through Acrobat Reader.


Click on heading to go to that section below.

 
 

Commission's Documents

Transcript for the August 1, 2003, Committee Conference . Date Uploaded: August 12, 2003. (Adobe Acrobat PDF file, 60 pages, 116 kilobytes.)

FINAL COMMISSION DECISION. Date Uploaded: August 08, 2003. (Adobe Acrobat PDF file, 424 pages, file size 1.13 megabytes.)

Final Commission Staff's Presiding Member's Proposed Decision Comments. Date Uploaded: July 24, 2003. (Adobe Acrobat PDF file, 8 pages, file size 2 kilobytes.)

Presiding Member's Proposed Decision. Date Uploaded: June 27, 2003. (Adobe Acrobat PDF file, 428 pages, FILE SIZE: 1.6 megabytes.)

Transcript of April 29 2003 Evidentiary Hearing. Date Uploaded: May 8, 2003. (Adobe Acrobat PDF file, 152 pages, 236 kilobytes.)

Transcript of April 28 2003 Evidentiary Hearing. Date Uploaded: May 7, 2003. (Adobe Acrobat PDF file, 304 pages, 428 kilobytes.)

01-AFC-24 - Addendum #3 to Staff Assessment. Date Uploaded: May 5, 2003. (Adobe Acrobat PDF file, 5 pages, 84 kilobytes.)

Commission Staff's Initial Brief (Uncontested Topics). Date Uploaded: April 24, 2003. (Adobe Acrobat PDF file, 3 pages, 71 kilobytes.)

Transcript of the April 8, 2003, Evidentiary Hearing. Date Uploaded: April 10, 2003. (Adobe Acrobat PDF file, 121 pages, 191 kilobytes.)

Transcript of the March 13, 2003 prehearing conference. Date Uploaded: April 2, 2003. (Adobe Acrobat PDF file, 138 pages, 212 kilobytes.)

Second Addendum to Staff Assessment, dated March 24, 2003. Online: April 2, 2003. (Adobe Acrobat PDF file, 3 pages, 11 kilobytes.)

Addendum to Staff Assessment Date online: March 7, 2003. (Adobe Acrobat PDF file, 14 pages, 31 kilobytes.)

Staff's Prehearing Conference Statement Date online: March 6, 2003. (Adobe Acrobat PDF file, 4 pages, 17 kilobytes.)

Final Staff Assessment of Palomar Power Plant Project Date online: January 24, 2003. (Adobe Acrobat PDF file, 513 pages, 1.6 megabytes - Note file size.)

Staff's Status Report # 8 Date online: November 26, 2002. (Adobe Acrobat PDF file, 3 pages, 16 kilobytes.)

Staff's Status Report # 7 Date online: October 25, 2002. (Adobe Acrobat PDF file, 2 pages, 16 kilobytes.)

Staff's Response to the petition from intervenor Bill Powers - for a Committee Workshop on the subject of alternative cooling options (Dated October 3, 2002). Date online: October 16, 2002. (Adobe Acrobat PDF file, 2 pages, 8 kilobytes.)

Staff's Status Report Number 6. Date online: September 25, 2002. (Adobe Acrobat PDF file, 2 pages, 12 kilobytes.)

Comments, RE: Draft EIR Review for the Escondido Research and Technology Center-SCH #2001121065, Date Uploaded: September 8, 2002. (Adobe Acrobat PDF file, 11 pages, 56 kilobytes.)

Staff's Status Report Number 5. Date online: August 29, 2002. (Adobe Acrobat PDF file, 3 pages, 20 kilobytes.)

Palomar Energy Project Preliminary Staff Assessment. Date Uploaded: August 28, 2002. (Adobe Acrobat PDF file, 493 pages, 3.4 megabytes.)

Palomar Energy Project Status Report #4. Date Uploaded: July 24, 2002. (Adobe Acrobat PDF file, 3 pages, 15 kilobytes.)

Palomar Energy Project Status Report. Date Uploaded: June 20, 2002. (Adobe Acrobat PDF file, 3 pages, 16 kilobytes.)

Staff Data Requests - Transmission System Engineering. Date Uploaded: May 24, 2002. (Adobe Acrobat PDF file, 4 pages, 21 kilobytes.)

Status Report #2. Date Uploaded: May 22, 2002. (Adobe Acrobat PDF file, 2 pages, 17 kilobytes.)

Staff Data Requests. Date Uploaded: May 3, 2002. (Adobe Acrobat PDF file, 43 pages, 244 kilobytes.)

Staff's Status Report Number 1. Date online: April 22, 2002. (Adobe Acrobat PDF file, 4 pages, 20 kilobytes.)

Transcript of the March 21, 2002 Palomar informational hearing and site vist.. Date Uploaded: April 10, 2002. (Adobe Acrobat PDF file, 89 pages, 148 kilobytes.)

Issue Identification Report. Date Uploaded: March 15, 2002. (Adobe Acrobat PDF file, 8 pages, 36 kilobytes.)

Staff Data Request Set, including two letters from U.S. EPA, which are attachments to the Air Quality Data Requests. Date Uploaded: March 14, 2002. (Adobe Acrobat PDF file, 43 pages, 244 kilobytes.)

Second Data Adequacy Recommendation. Date Uploaded: February 5, 2002. (Adobe Acrobat PDF file, 65 pages, 354 kilobytes.)

Staff's Data Adequacy Recommendation. Includes summary table and data adequacy worksheets. Date Uploaded: December 26, 2001. (Adobe Acrobat PDF file, 83 pages, 429 kilobytes.)

Notice of Receipt of Application for Certification, Date Uploaded: November 29, 2001. (Adobe Acrobat PDF file, 2 pages, 10 kilobytes.)


Applicant's Documents

Comments on Member's Proposed Decision Comments - Additional Documentation . Date Uploaded: July 25, 2003. (Adobe Acrobat PDF file, 8 pages, file size 188 kilobytes.)

Applicant's Comments on Presiding Member's Proposed Decision Date Uploaded: July 24, 2003. (Adobe Acrobat PDF file, 12 pages, 52 kilobytes.)

Applicant's Opening Brief, and Supporting Files - In regard to evidence introduced at the first day of hearings held on April 8, 2003, and uncontested issues. (MS Word files) Date online: April 22, 2003.

Applicant's Response on the Advantages and Disadvantages of Wet and Dry Cooling Systems. (Adobe Acrobat PDF file, 16 pages, 861 kilobytes.) Date online: November 14, 2002.

Applicant's Response to the petition from intervenor Bill Powers - for a Committee Workshop on the subject of alternative cooling options (Dated October 2, 2002). (Adobe Acrobat PDF file, 10 pages, 2.3 megabytes.) Date online: October 16, 2002.

PM 10 CEQA Mitigation Plan, Placed on line: October 16, 2002. (Adobe Acrobat PDF file, 45 pages, 184 kilobytes.)

Applicant's Responses to Commission Staff Data Request of March 8, 2002, Placed on line: April 11, 2002. (Adobe Acrobat PDF files)

Application For Certification CD-ROM, Date Uploaded: December 5, 2001. (Adobe Acrobat PDF files)


Intervenors' and Others' Documents

Comments of the City of Escondidio on the Presiding Member's Proposed Decision Date On-line July 24, 2003. (Acrobat PDF file, 10 pages, 300 kilobytes.)

Pre-Hearing Conference Statement - from Intervenor Bill Powers, Chair, Border Power Plant Working Group. Date online March 12, 2003. (Acrobat PDF file, 6 pages, 23 kb.)

Comments on the Final Staff Assessment from Intervenor Bill Powers, Chair, Border Power Plant Working Group. Date online February 10, 2003. (Acrobat PDF file, 5 pages, 20 kb.)

Documents submitted regarding applicant's 11/12/02 submittal on advantages and disadvantages of dry cooling, by intervenor Bill Powers. Date online: January 9, 2003. (MS Word and Everex EFax files).

Presentation on Alternative Cooling Options - from Intervenor Bill Powers at the October 22 Air Quality and Cooling Workshop. Date Uploaded: October 24, 2002. (Adobe Acrobat PDF file, 47 slides, 3.2 megabytes.)

Motion for a Committee Workshop - from Intervenor Bill Powers, Power Engineering, (Legionella bacteria) Date Uploaded: September 26, 2002. (Adobe Acrobat PDF file, 14 pages, 15 kilobytes.)

Exhibit A - Support for the requested Workshop. Date Uploaded: September 26, 2002. (Adobe Acrobat PDF file, 1 page, 8 kilobytes.)

Exhibit B - Support for the requested Workshop. Date Uploaded: September 26, 2002. (Adobe Acrobat PDF file, 1 page, 5 kilobytes.)

Data Request from Intervenor Bill Powers, Power Engineering, (Legionella bacteria) Date Uploaded: September 17, 2002. (Adobe Acrobat PDF file, 1 pages, 4.8 kilobytes.)

Data Request from Intervenor Bill Powers, Power Engineering (Attachment: Legionella bacteria), Date Uploaded: September 17, 2002. (Adob e Acrobat PDF file, 9 pages, 72 kilobytes.)

Data Request from Intervenor Bill Powers, Power Engineering, Date Uploaded: September 16, 2002. (Adobe Acrobat PDF file, 1 pages, 8 kilobytes.)


Figures and Maps

Regional Area Map. Date Uploaded: December 28, 2001. (Adobe Acrobat PDF file, 1 page, 1.3 megabytes - Note file size.)

Local Area Map. Date Uploaded: April 4, 2002. (Adobe Acrobat PDF file, 1 page, 460 kilobytes.)