2005 Integrated Energy Policy Report

Please note that the back-up materials, notices, and support documents for this proceeding have been moved to the Energy Commission's Archive website. That website is located at: www.energyarchive.ca.gov.


2005 IEPR - Docket # 04-IEP-1, et. al.

The 2004-2005 Integrated Energy Policy Report Committee that oversaw this proceeding is:

John L. Geesman,
Commissioner and Presiding Member

James D. Boyd,
Commissioner and Associate Member


Senate Bill 1389 (SB 1389, Bowen and Sher, Chapter 568, Statutes of 2002) requires the California Energy Commission to adopt an Integrated Energy Policy Report every two years.

This web section is for the 2005 Integrated Energy Policy Report, which was adopted by the Energy Commission on November 21, 2005. The Commission held more than 50 public workshops and hearings. It published 80 supporting reports, scores of presentations, and received hundreds of public comments. The final main reports can be downloaded below. Background materials and supporting documents can be found in the on our EnergyArchive site. The Executive Summary of the report is below.


Cover of 2005 IEPR 2005 Integrated Energy Policy Report
Commission Final Report
Adopted November 21, 2005,

Publication # CEC-100-2005-007-CMF.
(PDF file, 208 pages, 2.2 mb)

2005 Integrated Energy Policy Report - (REVISED) EXECUTIVE SUMMARY, Publication # CEC-100-2005-007-ES, posted: November 21, 2005. (PDF file, 18 pages, 440 kilobytes)

Commission Final Transmittal of 2005 Energy Report Range of Need and Policy Recommendations to the California Public Utilities Commission - Commission Final Report, publication # CEC-100-2005-008-CMF. Posted: December 16, 2005. (PDF file, 300 pages, 1.0 mb)

Strategic Transmission Investment Plan, Commission Final Report, publication # CEC-100-2005-006-CMF (PDF file, 117, 2.0 mb)