Welcome to the California Energy Commission


IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.



Docket Number: 07-AFC-08

Carrizo Energy Solar Farm Licensing Case
Documents Page

Most files are Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

Some PDF files are very large. Download these directly to your computer's hard drive by "right-clicking" the link to the file (use option-mouse click if on a Macintosh). After the file is downloaded, open it through Acrobat Reader.


 
 

Commission Documents

Draft Alternatives Section of the Final Staff Assessment. Posted August 6, 2009. (PDF file, 35 pgs, 1.3 mb).

Draft Soil & Water Section of the Final Staff Assessment. Posted August 6, 2009. (PDF file, 83 pgs, 672 kb).

Habitat Connectivity Planning for Selected Focal Species in the Carrizo Plain. Posted June 22, 2009. (PDF file, 87 pgs, 3.9 mb).

Staff's Draft Traffic and Transportation Section of the FSA. Posted June 22, 2009. (PDF file, 46 pgs, 544 kb).

Staff's Draft Noise and Vibration Section of the FSA. Posted June 22, 2009. (PDF file, 78 pgs, 2.8MB).

Staff's Proposed Schedule for Completing the Final Staff Assessment. Posted June 1, 2009. (PDF file, 4 pgs, 86.7 kb).

Staff's Objection and Response to Michael Strobridge 4/10/09 Letter Regarding Wildlife Corridor Study Information Confidentiality and FSA Schedule and 4/28/09 Letter Responding to the Applicant Regarding the Discovery Process . Posted May 5, 2009. (PDF file, 5 pgs, 72 kb).

Staff's Response to Applicant's Motion for a Protective Order to Maintain the Confidentiality of Corridor Location Results of the Wildlife Corridor Study, and to Designate Entities Having Access to the Corridor Location Results, filed on or about April 16, 2009. Posted May 1, 2009. (PDF file, 4 pgs, 221 kilobytes).

Clarification of Staff's Response to Applicant's Motion for a Protective Order. Posted April 23, 2009. (PDF file, 3 pgs, 113 kilobytes).

Staff's Response to Applicant's Motion for a Protective Order. Posted April 17, 2009. (PDF file, 2 pgs, 129 kilobytes).

Staff's Response to Petitions of Intervenors Ruskovich and Strobridge to Reopen and Extend Discovery. Posted April 15, 2009. (PDF file, 148 pgs, 2.2 megabytes).

Staff's Status Report # 2. Posted April 13, 2009. (PDF file, 8 pgs, 100 kb).

Presentation Slides for Task 1 Webinar. Posted April 2, 2009. (PDF file, 23 pgs, 4.4 mb).

Revised - Habitat Connectivity Planning for Selected Focal Species in the Carrizo plain. Posted April 2, 2009. (PDF file, 45 pgs, 3.1 mb).

Habitat Connectivity Planning for Selected Focal Species in the Carrizo plain. Posted March 26, 2009. (PDF file, 45 pgs, 2.85 mb).

Objection and Response to Intervenor Michael Strobridge's Data Request Dated March 3, 2009. Posted March 20, 2009. (PDF file, 6 pgs, 152 kb).

Tenative Schedule for the Corridor Study. Posted January 28, 2009. (PDF file, 1 pgs, 37.4 kb).

Maps and Data for the Corridor Study. Posted January 28, 2009. (PDF, XLS, KMZ Files).

Letter from the Energy Commission Regarding Wildlife Corridor Modeling for Proposed Solar Projects. Posted January 2, 2009. (PDF file, 3 pgs, 36 kb).

CEC's response RE: multi-agency wildlife corridor modeling process. Posted December 30, 2008. (PDF file, 12 pgs, 510 kb).

Draft Habitat Connectivity Planning for Selected Focal Species in the Carrizo Plain. Posted December 29, 2008. (PDF file, 6 pgs, 296 kb).

Transcript of Motion to Compel Hearing. Posted November 25, 2008. (PDF file, 128 pgs, 216 kb).

Preliminary Staff Assessment. Posted November 21, 2008. (PDF file, 661 pgs, 19.5 megabytes).

Staff's Updated Project Schedule. Posted November 17, 2008. (PDF file, 1 pgs, 77.1 kb).

Staff's Noise Survey Data. Posted October 17, 2008. (PDF file, 22 pgs, 1.39 mb.

Data Requests 113 Through 134 For the Carrizo Energy Solar Farm. Posted: August 29, 2008 (PDF file, 14 pgs, 467 kb)

Transcript of the August 5, 2008, Staff Data Response and Issues Reswolution Workshop. Posted: August 29, 2008 (PDF file, 179 pgs, 339 kb)

Data Requests 101 Through 112 For the Carrizo Energy Solar Farm. Posted: July 28, 2008 (PDF file, 10 pgs, 2.5 mb)

Email regarding updated Schedule and Letter regarding Request for Extension to respond to data requests 79 - 100. Posted: June 10, 2008 (PDF file, 3 pgs, 65.1 kb)

Data Requests 79 Through 100 For the Carrizo Energy Solar Farm. Posted: May 28, 2008 (PDF file, 13 pgs, 627 kb)

SLO County APCD Authority to Construct. Posted: May 13, 2008 (PDF file, 5 pgs, 52 kb)

Transcript of April 12, 2008 Information Workshop. Posted: May 8, 2008 (PDF file, 126 pgs, 644 kb)

Status Report #1. (PDF file, 6 pgs, 138 kb)

California Energy Commission Letter to Ausra Reguarding Needed Biological Surveys. Posted: April 4, 2008 (PDF file, 19 pgs, 290 kb)

Transcript of the March 12, 2008, Data Response Workshop. Posted: April 2, 2008 (PDF file, 195 pgs, 325 kb)

Letter to Victor Hollanda of the San Luis Obispo County Division of Building and Planning. Posted: February 8, 2008 (PDF file, 8 pgs, 96 kb)

Transcript of January 29, 2008 Informational Hearing and Site Visit. Posted: February 8, 2008 (PDF file, 76 pgs, 420 kb)

Data Requests 1 through 78. (PDF file, 30 pgs, 212 kb)

Issues Identification Report. (PDF file, 8 pgs, 136 kb)

Revised Data Adequacy Recommendation. (PDF file, 58 pgs, 1.04 mb)

Data Adequacy Recommendation. (PDF file, 103 pgs, 605 kb)


Applicant's Documents

Applicant's Draft Noise Mitigation Plan. Posted February 24, 2009. (PDF file, 53 pgs, 2.5 mb).

Applicant's Traffic Mitigation Plan. Posted February 24, 2009. (PDF file, 14 pgs, 1.3 mb).

Applicant's Comments on Preliminary Staff Assessment. Dated December 2008. Posted February 4, 2009. (PDF file, 102 pgs, 3.2 mb).

Applicant's letter requesting information on the status, methodology, and schedule for a multi-agency wildlife corridor modeling process. Posted December 30, 2008. (PDF file, 3 pgs, 150 kb).

Applicant's Responses to CURE Data Requests Motion to Compel (DRs 37, 38, 51, 52, 56, 57, 58, 59, 64, and 67) - Posted: December 29, 2008. (PDF file, 20 pgs, 2.4 mb)

Applicant's Response to CURE's Motion to Compel Production of Information - Posted: January 6, 2009. (PDF file, 10\6 pgs, 828 kb)

Reys Residence Noise Impact Analysis. - Posted: January 6, 2009. (PDF file, 10 pgs, 304 kb)

Applicant's Biological Survey Report - Posted: January 6, 2009. (PDF file, 223 pgs, 5.4 mb)

Applicant's Responses to CEC Data Requests 110-112 and Attachment A - Posted: January 6, 2009. (PDF file, 32 pgs, 5.1 mb)

Applicant's Responses to Data Requests 113 to 134 - Posted: January 6, 2009. (PDF file, 31 pgs, 560 kb)

Applicant's Objections to California's Unions for Reliable Energy's Data Requests - Posted: January 6, 2009. (PDF file, 9 pgs, 112 kb)

Applicant's Responses to Comments from CEC Workshop - Posted: January 6, 2009. (PDF file, 19 pgs, 1.9 mb)

Request for Corps Verification of Jurisdiction - Posted: July 17, 2008. (PDF file, 261 pgs, 20.5 mb)

Letter regarding Supplement to the AFC. Posted: July 9, 2008. (PDF files)

Supplement to the Carrizo Energy Solar Farm AFC

Response to California Energy Commission Data Requests 79 - 100 - Posted: July 1, 2008. (PDF file, 32 pgs, 1.27 mb)

Hydrology & Hydrogeology of the Vicinity of the Proposed Carrizo Energy Solar Farm - Posted: July 1, 2008. (PDF file, 298 pgs, Attention: This is an extremely large file, 32.8 mb in size. Please right click (option click on the Macintosh) here and download file to your computer to open.)

Response to Comments from 3-12-08 Data Response Workshop - Posted: April 21, 2008. (PDF file, 29 pgs, 1.8 mb)

Responses to Docketed Letters, Data Requests, and Comments from Robin Bell (Part 2) - Posted: March 19, 2008. (PDF file, 13 pgs, 292 kb)

Responses to January 29th, Informational Hearing - Posted: March 19, 2008. (PDF file, 16 pgs, 724 kb)

Responses to John Rushovich's Comments - Posted: March 19, 2008. (PDF file, 15 pgs, 372 kb)

Responses to Robin Bell's Questions - Posted: February 28, 2008. (PDF file, 9 pgs, 508 kb)

Responses to CEC Data Requests (#1-78) - Posted: February 27, 2008. (PDF file, 96 pgs, 750 kb)

Supplemental Information in Response to Energy Commission Data Adequacy Requests - Posted: December 18, 2007 (PDF file, 202 pgs, 7.7 mebabytes)

Application For Certification (PDF files, posted 10/24/07)


Intervenors' and Others' Documents

California Department of Conservation's Preliminary Staff Assessment Comments Regarding Land Use. Posted: September 24, 2009. (PDF file, 5 pgs, 256 kb)

Letter from the Calfiornia Department of Fish and Game Regarding Notification of Lake or Streambed Alteration for the Carrizo Energy Solar Farm. Posted: July 16, 2009. (PDF file, 5 pgs, 158 kb)

Letter from the Calfiornia Department of Fish and Game Regarding Incidental Take Permit Application for the Carrizo Energy Solar Farm. Posted: May 27, 2009. (PDF file, 10 pgs, 426 kb)

Michael Strobridge Response to Status Report 2. Posted: May 5, 2009. (PDF file, 4 pgs, 48 kb)

Intervener Michael Strobridge's Response in regards to noise in Carrizo Energy's April 14th Objection To Interveners Petition to Extend the 180 day Discovery Process. Posted: May 5, 2009. (PDF file, 3 pgs, 1 mb)

Comments from Air Pollution Control District, County of San Luis Obispo. Posted: February 4, 2009. (PDF file, 9 pgs, 7 mb)

Comments from the Atascadero Unified School District. - Posted: January 16, 2009. (PDF file, 4 pgs, 180)

Comment from Jeffrey Single of Department of Fish & Game Regarding the Preliminary Staff Assessment. - Posted: January 5, 2009. (PDF file, 15 pg, 3.49 mb)

San Louis Obispo County Agriculture Dept. Comments to Carrizo. - Posted: January 6, 2009. (PDF file, 8 pg, 380 kb)

Atascadero Unified School District Letter in Support of the Application for Certification. - Posted: December 29, 2008. (PDF file, 1 pg, 84 kb)

Community Enviromental Counsel Comments to Carizo. Posted: January 6. 2009. (PDF file, 16 pgs, 304 kb)

CURE Data Requests - Set Three - 96-107. Posted: January 6. 2009. (PDF file, 9 pgs, 136 kb)

San Luis Obispo County Air Pollution Control District Comments Regarding Pre-Application Meeting/Referral/Notice. - Posted: November 12, 2008. (PDF file, 9 pgs, 664 kb)

Issuance of a Modified Air Pollution Control District Authority to Construct Authorizing Two Emergency Backup Diesel Engines. Posted: October 3, 2008 (PDF file, 4 pgs, 1.3 mb)

CURE Data Requests - Set Two - 47-95. Posted: January 6, 2009 (PDF file, 21 pgs, 4.1 mb)

CURE Data Requests - Set One - 1-46. Posted: July 14, 2008 (PDF file, 56 pgs, 1.36 mb)

San Luis Obispo County Air Pollution Control District Authority to Construct. - Posted: July 2, 2008. (PDF file, 3 pgs, 108 kb)

San Luis Obispo County Deparment of Agriculture comments on issues of concern specifically related to agricultural resources and operations. - Posted: April 1, 2008. (PDF file, 6 pgs, 113 kb)

Department of Fish and Game's review of the Projects Application for Certification - Posted: March 27, 2008. (PDF file, 15 pgs, 65 kb)

Carrizo Plain Solar Interconnection System Impact Study Report - Posted: March 26, 2008. (PDF file, 32 pgs, 352 kb)

San Luis Obispo County, Department of Building and Planning, Supplemental Response. - Posted: March 12, 2008. (PDF file, 5 pg, 368 kb)

Agency Comments from James Kilmer - Posted: March 6, 2008. (PDF file, 1 pg, 20 kb)

Agency Comments from California Regional Water Quality Control Board - Posted: March 6, 2008. (PDF file, 3 pgs, 276 kb)

Agency Comments from County of San Luis Obispo Department of Public Works, Water Resources Unit - Posted: March 6, 2008. (PDF file, 1 pg, 60 kb)

San Luis Obisbo County Board of Supervisors' Initial Comments on Issues Identification Report. (PDF file, 2 pgs, 71.9 kb)

Response to Review of Carrizo Energy Solar Farm from San Luis Obispo County. (PDF file, 12 pgs, 208 kb)

Petition to Intervene by California Unions for Reliable Energy. (PDF file, 5 pgs, 44 kb)

County of San Luis Obispo Air Polution Control Districts Comment Concerning the Power Plant Project. (PDF file, 1 pgs, 74.2 kb)

Request for Agency Participation. (PDF file, 1 pgs, 22.1 kb)


Figures and Maps

Project Vicinity (PDF files, 1 pg, 266 kb)

Aerial View of Location (PDF files, 1 pg, 211 kb)