IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.



Huntington Beach Energy Project
Documents

Docket Number: 2012-AFC-02

Commission's Documents

California Energy Commission Staff's Status Report #4. Dated 7/10/13.

Report of Conversation regarding Potential Tsunami Run-Up. Dated 3/5/13.

Staff's Status Report #3. Dated 5/30/13.

Staff's Data Requests 107 - 109. Dated 4/16/13.

Staff's Data Requests 104 - 106. Dated 4/15/13.

Staff's Status Report #2. Dated 4/15/13.

Hearing Advisor Paul Kramer's Email re Change in the Process for Obtaining the Current Proof of Service List. Posted: March 25, 2013. (PDF, 1 page, 74 kb)

Report of Conversation between California Energy Commission's Lisa Worrall and Aaron Klemm and Jane James of the City of Huntington Beach regarding Method and Rate of Calculating Applicable Development Impact fees to the Huntington Beach Energy Project. Dated February 1, 2013.

Staff's Status Report #1. Dated 1/30/13.

Record of Conversation with Lisa Worrall, CEC and Aaron Klemm, City of Huntington Beach Regarding Applicable Development Impact Fees to the Huntington Beach Energy Project. Dated 12/20/12.

Record of Conversation with Mike Conway and Meynardo Sanchez of the Orange County Flood Control District re Huntington Channel. Dated 1/22/2013.

Record of Conversation with Lisa Worrall, CEC and Carrie Delgado, Huntington Beach Union High School District Regarding Capacity Information. Dated 1/22/2013.

Staff's Data Requests 99 through 103. Dated: 1/15/2013.

Staff's Data Requests 73 through 98. Dated: 12/20/2012.

Report of Site Visit with Gabriel Roark (CEC) with Applicants Regarding Huntington Beach Energy Project's Application for Certification (AFC) including Proposed Depths of Excavation. Dated: 9/28/2012.

Report of Site Visit with Anwar Ali (CEC) with Applicants, CA Fish and Game and US Fish and Wildlife Service (USFWS) Regarding Huntington Beach Energy Project's Application for Certification (AFC), its Proposed Site Location and Surrounding Areas. Dated:9/28/2012.

Staff's Letters to [14] Native American Tribes to Participate in CEC / Tribal Consultation Regarding Huntington Beach Energy Project. Dated: November 1, 2012.

WebEx Recording of the November 14, 2012 Workshop.
The WebEx player is automatically installed when you click the link to begin playback. Problems with playback? Contact WebEx technical support at 1-866 229-3239.


Staff's Data Inquiry as Respects to the Applicant's DR-36 - Cultural Resources. Dated: November 13, 2012.

November 14, 2012 Workshop Agenda. Posted November 13, 2012. (PDF file, 1 page, 70 kb)

Letters from Robert P. Oglesby, Executive Director. Posted:

  • Executive Director Letter to Honorable Tom Harmon Member of Senate 35th District
  • Executive Director Letter to Honorable John M W Moorlach Chairman of the Orange County Board of Supervisors
  • Executive Director Letter to Honorable Jim Silva, Member of the Assembly 67th District
  • Executive Director Letter to Honorable Don Hansen Mayor of Huntington Beach

Report of Conversation Between Felicia Miller and Robert Mason Regarding Construction Details.

Energy Commission Staff's Data Requests, 1 through 72, and Coastal Commission Data Request.

Report of Conversation Between Felicia Miller and Safouh Sayed Regarding ASCON Landfill Clean Up.

Transcript of the September 10, 2012 Environmental Scoping Meeting and Informational Hearing.

Presentation shown at the September 10, 2012 Environmental Scoping Meeting and Informational Hearing.

WebEx Recording of the September 10, 2012 Environmental Scoping Meeting and Informational Hearing.
The WebEx player is automatically installed when you click the link to begin playback. Problems with playback? Contact WebEx technical support at 1-866 229-3239.


Staff's Issues Identification Report for the Huntington Beach Energy Project. Dated August 31, 2012.

Staff's Revised Data Adequacy Recommendation.

Staff's Letter Requesting Agency Participation.

Staff's Letter to Librarian Regarding the Document Handling.

Staff's Data Adequacy Recommendation.

Applicant's Documents

Applicant's Correspondence with California Energy Commission F. Miller Regarding Cheng Cycle Technology Information. Dated 7/12/2013.

Applicant's Status Report #4. Dated 7/8/2013.

Applicant's Correspondence Related to Air Quality. Dated 7/3/2013.

Applicant's Responses to Staff's Informal Requests for Visual Resources. Dated 6/19/2013.

Applicant's Status Report #3. Dated 5/24/2013.

Applicant's Responses to Data Requests, Set 4, Nos. 104 to 106 (Air Quality). Dated 5/17/2013.

Applicant's Responses to Data Requests, Set 5, Nos. 107-109 (Public Health). Dated 5/17/2013.

Applicant’s Correspondence Related to Air Quality. Dated 5/10/2013. Posted May 14, 2013. (PDF File, 30 Pages, 1.8 MB)

Applicant's Submittal of Geologic Resources - Final Site Investigation Report dated May 1998 for Soil and Groundwater. Dated 4/19/2013. Posted April 22, 2013. (PDF File, 639 Pages, 23.5 MB) Please note large file size.

Applicant's Status Report. Dated 4/15/2013.

Applicant's Submittal of Air Quality Correspondence to South Coast Air Quality Management District. Dated 3/27/013.

Applicant's Submittal of Information Regarding Construction Risk Value (Public Health). Dated 3/20/2013.

Applicant's Submittal of Additional Construction and Demolition Information. Dated 3/20/2013.

Applicant's Revision to Construction and Demolition Schedule. Dated 3/19/2013.

Applicant's Submittal of Auto CAD Files Related to Preliminary Grading and Drainage Plans (Water Resources). Dated 3/18/2013.

Applicant's Correspondence dated March 9, 2013 Regarding Project Construction Schedule. Dated 3/18/2013.

Plot Plans for the Existing Huntington Beach Generating Station. Dated 3/14/2013. Posted: March 14, 2013. (PDF File, 10 Pages, 1.4 mb)

Applicant's Correspondence Related to Air Quality and Cover Letter for Attachments. Dated 3/14/2013.

Response to Staff’s Informal Inquiry Regarding the Existing Huntington Beach Generating Station's Fuel Oil Tanks. Dated 3/14/2013.

Applicant’s Responses to Staff’s Workshop Queries and Related Air Quality Modeling Files. Dated 3/14/2013.

Applicant’s Supplemental Responses to Staff’s Data Request, No. 31 (Biological Resources). Dated 3/11/2013. Posted: March 13, 2013. (PDF File, 13 Pages, 2.1 mb)

AES Response to Staff Query - Use and Number of Stories for Specific HBEP Buildings. Dated 3/8/2013.

Applicant's Correspondence Related to Air Quality - January and February 2013. Dated 2/27/2013.

Applicant's Responses to Data Requests, Set 2A (Public Health #74-77). Dated 2/22/2013.

Cover Letter for Air Quality Modeling Files Related to Applicant's Response to Staff's Data Requests, Set 2A (#74-77). Dated 2/22/2013.

Applicant's Responses to Staff's Data Requests, Set 3 (Soil and Water Resources #99-103). Dated 2/15/2013.

Applicant's Supplemental Responses to Staff's Data Requests, Set 2 (Soil and Water Resources #80-83 and Traffic and Transportation #92-94. Dated 2/15/2013.

Applicant's Email Regarding Existing and Proposed Workforce Staff at the Huntington Beach Generating Station. Dated 2/12/2013.

Applicants Request for Extension to Submit Responses to the California Energy Commission Staff's Data Requests, Set 2 (#74 - 77). Dated 2/8/2013.

Applicant's Correspondence Related to Air Quality - Ammonia Emmissions. Dated 2/6/2013.

Applicant's Response to Staff's Data Requests, Set 1, Data Request No. 40 Socioeconomics. Dated 2/6/2013.

Applicant’s Cover Letter Regarding Supplemental Files for Visual Resources, Specifically KOP 1 through KOP 5, and Staff’s Data Request 95. Dated 2/4/013.

Applicant's Responses to Staff's Data Requests, Set 2 (Nos. 73 through 98). Dated 1/22/2013.

CH2MHill, Jerry Salamy’s Email Regarding Huntington Beach Energy Project Commissioning Emissions. Dated 1/23/2013.

Applicant's Cover Letter Regards to Supplemental Files in Response to CEC Staff's Visual Resources Data Request Set 2, No. 97. Dated 1/22/2013.

Applicant's Status Report. Dated and posted January 22, 2013. (PDF file, 8 pages, 414 kb).

Applicant's Cover Letter Regards to Air Quality Modeling Files Related to Applicant's Response to Staff's Data Request AQ-11. Dated 1/17/2013. Posted January 22, 2013. (PDF file, 4 pages, 385 kb)

Applicant's Additional Responses to Intervenor, Jason Pyle's Data Requests, Set 1 (Numbers 1 through 16). Dated 1/17/2013. Posted January 22, 2013. (PDF file, 108 pages, 2.5 mb)

Applicant's Responses to CEC Staff's Data Requests, Set 1 (AQ-11; BIO-23 through BIO-26). Dated 1/16/2013. Posted January 22, 2013. (PDF file, 65 pages, 2.3 mb)

Request for Extension to Submit Certain Data Responses Contained In CEC Staff's Data Responses Set Two (#73-98) and Objections. Dated and posted January 9, 2013. (PDF file, 7 pages, 377 kb)

Applicant's Submittal of Email Correspondence Related to Air Quality. Dated 1/3/2013. Posted January 4, 2013. (PDF file, 47 pages, 1.6 megabytes)

Applicant's Supplemental Response to Data Request No. 27 (Biological Resources). Dated 1/3/2013. Posted January 4, 2013. (PDF file, 11 pages, 1.2 megabytes)

Huntington Beach Energy Project and GHG Calculations and Heat Rates. Dated 1/19/2012. Posted December 20, 2012. (PDF file, 6 pages, 225 kb)

Applicant's Response to Intervenor Jason Pyle's Data Requests, Set 1 no. 1-16. Dated an posted December 13, 2012. (PDF file, 12 pages, 778 kb)

Huntington Beach Energy Project's Start/Stop Emissions and GHG Performance. Dated December 12, 2012. Posted December 13, 2012. (PDF file, 2 pages, 623 kb)

Applicant's Supplemental Data Response to Data Request #68 (Visual). Dated December 11, 2012. Posted December 12, 2012. (PDF file, 14 pages, 6.6 megabytes)

Applicant's Correspondence Related to Air Quality. Dated December 7, 2012. Posted December 12, 2012. (PDF file, 17 pages, 524 kb)

Applicant's Responses to Supplemental Data Responses No. 36 (Cultural Resources). Dated December 7, 2012. Posted December 12, 2012. (PDF file, 7 pages, 1.8 megabytes)

Applicant's Response to SCAQMD's October 26, 2012 Email Request RE: HBEP Start/Stop Emissions and GHG Performance. Dated December 7, 2012. Posted December 12, 2012. (PDF file, 11 pages, 660 kb)

Applicant's Objections to Certain Data Requests Contained In Set One 1-16 from Intervenor Jason Pyle. Dated December 6, 2012. Posted December 10, 2012. (PDF file, 7 pages, 276 kb)

Applicant's Request for Additional Extension of Time to Submit Responses to Staff's Data Requests, Set 1A (AQ-11, BIO-23, BIO-24, BIO-25, BIO-26). Dated December 3, 2012. Posted December 3, 2012. (PDF file, 4 pages, 327 kb)

Applicant's Correspondence to the USEPA Regarding to Greenhouse Gas Prevention of Significant Deterioration Pre-Construction Permit. Dated November 7, 2012. Posted November 7, 2012. (PDF file, 712 pages, 34 mb)

Applicant's Responses to Staff's Data Requests, Set 1A (1-72). Dated November 2, 2012. Posted November 5, 2012. (PDF file, 207 pages, 12.9 mb)

Emission Rates and Modeling Results. Dated October 25, 2012. Posted October 26, 2012. (PDF file, 3 pages, 344 kb)

AES Response to SCAQMD Regarding Emission Rates and Modeling Results for the Huntington Beach Energy Project. Dated October 23, 2012. Posted October 25, 2012. (PDF file, 16 pages, 3.9 mb)

Applicant's Request for Extension to Submit Data Responses, Set One 1-72; Objections. Dated October 22, 2012.

AES Response to SCAQMD Air Application. Dated September 19, 2012.

AES's Application for Greenhouse Gas PSD Pre-Construction Permit. Dated September 19, 2012.

Applicant's Site Visit and Informational Hearing Materials. Dated September 13, 2012.

Applicant's Comments on Staff's Issues Identification Report. Dated September 6, 2012.

Applicant's Letter dated August 23, 2012 Enclosing Correspondence to California Coastal Commission.

Applicant's Submittal of the Preliminary Geotechnical Report dated August 6, 2012 Prepared by Ninyo and Moore, 2011.

Biological Resources 5.2-2CR to be included with the Applicant's Data Adequacy Supplement Dated August 6, 2012. Posted August 8, 2012. (PDF file, 1 page, 470 kb)

Applicant's Data Adequacy Supplement. Dated August 6, 2012. Posted August 8, 2012. (PDF file, 172 pages, 13.1 megabytes)

Applicant's Application for Certification. Posted: June 28, 2012. (PDF files)

Intervenor's and Other's Documents

Public Comments

Public Comments. Last updated:

Documents

South Coast Air Quality Management District's Comments on the Data Clarification Response for the Proposed Huntington Beach Energy Project. Dated June 7, 2013.

South Coast Air Quality Management District's Request for Additional Clarifying Information. Dated February 19, 2013.

Orange County Public Works’ Comments on the Huntington Beach Energy Project. Dated 12/12/2012.

California Coastal Commission's Letter Regarding Status of Review for the AFC. Dated 1/23/2013.

U.S. EPA's Letter to AES Transferring PSD Permit to SCAQMD. Dated 1/10/2013. Posted January 11, 2013. (PDF file, 2 pages, 53 kb)

Santa Ana Regional Water Quality Control Board's Response to CEC's Letter of August 3, 2012 Regarding Huntington Beach Energy Project. Dated 12/10/2012. Posted December 13, 2012. (PDF file, 1 page, 283 kb)

Los Angeles and Orange Counties Building and Construction Trades Council's Reply to CEC's August 10, 2012 Letter RE Construction and Operation Workforce for the Proposed Huntington Beach Energy Project. Dated 12/6/2012. Posted December 11, 2012. (PDF file, 3 pages, 243 kb)

City of Huntington Beach Comments on the Huntington Beach Energy Project. Dated December 6, 2012. Posted 12/7/2012. (PDF file, 32 pages, 2.4 megabytes)

Huntington Beach Wetlands Conservancy Comment Letter. Dated December 3, 2012. Posted 12/7/2012. (PDF file, 2 pages, 463 kb)

Intervenor Jason Pyle's Data Requests 1-16. Dated 11/16/2012. Posted November 16, 2012. (PDF file, 7 pages, 62 kb)

California State Lands Commission - Agency Comments to AFC. Dated 9/19/2012. Posted September 26, 2012. (PDF file, 4 pages, 598 kb)

Comments from the Residents for Responsible Desalination Regarding the Proposed Huntington Beach Energy Project. Dated 9/17/2012.

U.S. Fish and Wildlife Service – Agency Comments to AFC. Dated 9/10/2012.

Petition to Intervene by Jason Pyle. Dated 9/6/2012. Posted September 10, 2012. (PDF file, 3 pages, 245 kb)

Comments by the California Coastal Commission on Data Adequacy Review. Dated 8/3/2012. Posted August 7, 2012. (PDF file, 10 pages, 565 kb)

Figures and Maps

No Figures and Maps at this time.