IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.



Hydrogen Energy Power Plant
Documents (Original AFC)

Docket Number: 08-AFC-8

Current Documents for the Hydrogen Energy Project are located on the Amended AFC page. The Amended AFC pages contain materials from 5/2/12 forward.

Commission's Documents

Department of Conservation, Division of Oil, Gas, and Geothermal Resources (DOGGR) Data Requests #1 - 4. Dated: March 16, 2012. Posted: March 18, 2012. (PDF file, 7 pages, 90 kb)

Staff Letter Regarding Outstanding Infomation Items. Posted: August 5, 2011. (PDF file, 14 pages, 544 kb)

Data Request Set 4, (219-244). Posted: November 22, 2010. (PDF file, 7 pages, 66 kb)

Staff's Status Report No. 8. Posted: September 21, 2010. (PDF file, 4 pages, 43 kb)

Preliminary Staff Assessment, Part 1. Posted: August 31, 2010. (PDF file, 473 pages, 5.1 megabytes)

Staff's Comment on the Preliminary Determination of Compliance. Posted: September 8, 2010. (PDF file, 6 pages, 66 kb)

Staff's Status Report No. 7. Posted: July 23, 2010. (PDF file, 5 pages, 66 kb)

California Energy Commission Participation as a Cooperative State Agency. Posted: September 8, 2010. (PDF file, 1 pages, 238 kb)

Staff's Status Report No. 6. Dated May 13, 2010. Posted: May 13, 2010. (PDF file, 6 pages, 60 kb)

Request that Dan Bradshaw's comments be docketed. Dated May 11, 2010. Posted: September 8, 2010. (PDF file, 1 pages, 25 kb)

Letter from the California Energy Commission Requesting the Assistance of the Kern Valley Indian Council. Dated April 20, 2010. Posted: September 8, 2010. (PDF file, 20 pages, 659 kb)

Staff's Issues Statement. Dated March 25, 2010. Posted: March 25, 2010. (PDF file, 3 pages, 20 kb)

Staff's Status Report No. 3. Posted: March 10, 2010. (PDF file, 4 pages, 183 kb)

Staff's Response Letter to Occidental Regarding the CO2 EOR Project. Posted: Spetember 8, 2010. (PDF file, 5 pages, 135 kb)

Staff's Data Request, Set Two (133 - 152). Posted: September 8, 2010. (PDF file, 12 pages, 180 kb)

Staff's Status Report No. 2. Posted: January 5, 2010. (PDF file, 4 pages, 77.2 kb)

Instructions to Librarian - Regarding Revised Application for Certification - Amendment to Eliminate the Auxiliary Combustion Turbine Generator. Posted: October 26, 2009. (PDF file, 6 pages, 60 kb)

Transcript of the September 16, 2009, Informational Hearing. Posted: October 26, 2009. (PDF file, 111 pages, 183 kb)

Staff's Status Report No. 1. Posted: October 23, 2009. (PDF file, 4 pages, 48 kb)

Request for Agency Participation. Posted: September 8, 2010. (PDF file, 4 pages, 123 kb)

Data Request Set 1, (#'s 1 - 132). Posted: October 12, 2009. (PDF file, 42 pgs, 217 kb)

Issues Identification Report. Posted: September 8, 2009. (PDF file, 10 pgs, 160 kb)

Revised Data Adequacy Recommendation. Posted: August 26, 2009. (PDF file, 38 pgs, 288 kb)

Data Adequacy Recommendation. Posted: June 30, 2009. (PDF file, 112 pgs, 477 kb)

Applicant's Documents

Applicant's Response to the Submitted Data Requests of Intervenor Association of Irritated Residents. Posted: April 27, 2012. (PDF file, 8 pages, 98 kb)

Applicant's Status Report #9. Posted: November 17, 2011. (PDF file, 16 pages, 1.23 mb)

Applicant's Requests for Extensions of Time and Objections to Certain Data Requests. Posted: November 24, 2010. (PDF file, 9 pages, 108 kb)

OEHI Presentation on the Draft MRV Plan from the August 18 workshop. Posted: August 23, 2010. (PDF file, 38 pages, 898 kb)

Applicant's Responses to California Energy Commission Question from July 22, 2010, Correspondence . Posted: September 8, 2010. (PDF file, 7 pages, 2.3 mb)

Applicant's Comments on the Preliminary Determination of Compliance . Posted: September 8, 2010. (PDF file, 46 pages, 553 kb)

Applicant's Responses to California Energy Commission Question from July 13, 2010, Correspondence . Posted: September 8, 2010. (PDF file, 13 pages, 1.1 mb)

Draft Monitoring, Reporting and Verifying Plan for the Oxy Elk Hills CO2 EOR Project. Posted: July 27, 2010. (PDF file, 44 pages, 1.2 mb)

Applicant's Responses to CEC Questions from July 6, 2010 Correspondence. Posted: July 23, 2010. (PDF file, 9 pages, 1.1 mb)

Applicant's Status Report No. 7. Posted: July 23, 2010. (PDF file, 8 pages, 94 kb)

Video: "Carbon Capture and Sequestration with Enhanced Oil Recovery". Posted: July 21, 2010. (10:23 minute .mov movie file)
Large Size (640 x 360, 121.5 megabytes)
Small Size (478 x 269, 26 megabytes)

Applicant's Response to April 12, 2010, Data Response and Issues Resolution Workshop . Posted: September 8, 2010. (PDF file, 5 pages, 446 kb)

Responses to the April 12, 2010 CEC Data Response and Issues Resolution Workshop (1 - 40). Updated: June 24, 2010. Posted: June 23, 2010. (PDF files)

NOTE: Some of the files are very large. Please right click the link (option click on a Macintosh).

OEHI's CO2 EOR Presentation, May 21, 2010. Posted: May 24, 2010. (26 pgs, 4.2 megabytes)

Preliminary Project Description (Pre-Feed Stage). Posted: May 6, 2010. (PDF files)

Class II UIC Permit Application (Sample). Posted: May 6, 2010. (PDF files)

Technical Studies - Storing CO2 with Enhanced Oil Recovery. Updated: May 10, 2010. (PDF files)

NOTE: Some of the files are very large. Do not attempt to donwload unless you have broadband connection. Please right click the link (option click on a Macintosh).

Applicant's Responses to Data Requests Set One (Nos. 1-132), Dated November 11, 2009. Posted: 4/1/2010. (PDF file, 143 pages, 1.4 megabytes)

Figures and Attachments, Posted: 5/10/2010. (PDF files)

Applicant's Response to California Energy Commission Staff Data Request Number Eight . Posted: September 8, 2010. (PDF file, 10 pages, 131 kb)

Applicant's Status Report No. 4. Dated March 11, 2010. Posted: March 22, 2010. (PDF file, 11 pages, 496 kb)

Applicant's letter from the Tejon Tribe and FAA determinations of the Notices of Proposed Construction or Alteration . Posted: September 8, 2010. (PDF file, 76 pages, 4.2 mb)

Applicant's Responses to Data Requests Set Two (133 through 152), Posted: 2/2/2010. (PDF file, 51 pages, 6.2 megabytes)

Applicant's Responses to Data Requests Set One (17, 65, 77, and 85 through 90), Posted: 2/2/2010. (PDF file, 143 pages, 7.6 megabytes)

Applicant's letter to the Untied States Army Corps of Engineers . Posted: September 8, 2010. (PDF file, 11 pages, 217 kb>)

Appicant's response to the California Energy Commission Data Requests, Set One (1, 2, 11, 17, 31b, 32, 33, 36, 64f, 85 through 90, and 125 through 132) . Posted: September 8, 2010. (PDF file, 48 pages, 1.1 mb)

Applicant's Status report No. 3. Posted: 01/07/2010. (PDF file, 3 pages, 44 kb)

Applicant's Responses to CEC Data Requests Set One (Nos. 1, 2, 6, and 19). Posted: 01/07/2010. (PDF file, 14 pages, 296 kb)

Applicant's Status report No. 2, Received: 11/19/09. Posted: 01/07/2010. (PDF file, 2 pages, 36 kb)

Applicant's Status report No. 1, Received: 10/23/09. Posted: 01/07/2010. (PDF file, 3 pages, 36 kb)

Applicant's Request for Extension of time and Objection to certain Data Requests by the California Energy Commission Staff . Posted: September 8, 2010. (PDF file, 20 pages, 295 kb)

Applicant's Objections to Certain Data Requests from Association of Irritated Residents . Posted: September 8, 2010. (PDF file, 11 pages, 180 kb)

Revised Air Quality Modeling Files . Posted: September 8, 2010. (PDF file, 1 pages, 61 kb)

Applicant Amendment to the Authority to Construct . Posted: September 8, 2010. (PDF file, 112 pages, 1.8 mb)

Submittal of the Amendment to the Prevention of Significant Deterioration . Posted: September 8, 2010. (PDF file, 104 pages, 2.8 mb)

Revised Application for Certification Cover Letter . Posted: September 8, 2010. (PDF file, 3 pages, 975)

Amendment to the Revised Application for Certification . Posted: September 8, 2010. (PDF file, 125 pages, 4.3 mb)

Survey Result of the Blunt-nose Leopard Lizard Survey . Posted: September 8, 2010. (PDF file, 54 pages, 2.2 mb)

Project Modification . Posted: September 8, 2010. (PDF file, 4 pages, 356 kb)

Supplement to Revised AFC In Response to CEC Data Adequacy Review, received 7/13/09. Posted: 8/19/2009. (PDF file, 219 pages, 10.8 megabytes)

Transition Cluster Phase I Interconnction Study Report . Posted: September 8, 2010. (PDF file, 33 pages, 422 kb)

REVISED Application For Certification, Volumes 1 and 2, filed May 28, 2009. Posted: May 29, 2009. (PDF files)


Note: The original AFC is being made available for archival purposes. Please refer to the REVISED AFC for all future activities. - Webmaster

ORIGINAL Application For Certification, Volumes 1 and 2, filed July 30, 2008. Posted: July 31, 2008. (PDF files)

NOTE: Some of the files are very large. Do not attempt to donwload unless you have broadband connection. Please right click the link (option click on a Macintosh).

Intervenor's and Other's Documents

Public Comments

Public Comments. Last updated:


Documents

CalRecycle's Letter Regarding Kern County's Proposed Mitigation Measure Regarding Residual Waste. Posted: June 9, 2011. (PDF file, 2 pages, 48 kb)

U.S. Environmental Protection Agency comments on Part 1 of the Preliminary Staff Assessment. Posted: November 24, 2010. (PDF file, 10 pages, 229 kb)

San Joaquin Valley Air Pollution Control District's Preliminary Determination of Compliance. Posted: September 21, 2010. (PDF file, 332 pages, 12.4 mb)

Comment from Paul Staples to the California Energy Commission about the Funding of a Coal to Hydrogen Facility. Posted: September 8, 2010. (PDF file, 1 pages, 70 kb)

Brief of the Environmental Defense Fund and Natural Resources Defense Council. Posted: September 8, 2010. (PDF file, 6 pages, 86 kb)

Environmental Protection Agency comments on San Joaquin Valley Air Pollution Control District's Preliminary Determiantion of Compliance. Posted: September 2, 2010. (PDF file, 7 pages, 372 kb)

Association of Irritated Residents Petition to Intervene. Posted: September 8, 2010. (PDF file, 3 pages, 37 kb)

California Unions for Reliable Energy Petition to Intervene. Posted: September 8, 2010. (PDF file, 8 pages, 500 kb)

Response letter from Cal/OSHA. Posted: September 8, 2010. (PDF file, 14 pages, 545 kb)

Jane Persinger Comments regarding the Hydrogen Energy California Power Plant Project. Posted: September 8, 2010. (PDF file, 2 pages, 29 kb)

US. Environmental Protection Agency's comments to DOE's proposed Draft Environmental impact Statement. Posted: September 8, 2010. (PDF file, 14 pages, 823 kb)

National Resources Defense Council Petition to Intervene. Posted: September 8, 2010. (PDF file, 9 pages, 713 kb)

Status Report of the Kern-Kaweah Chapter of the Sierra Club. Posted: September 8, 2010. (PDF file, 5 pages, 193)

Daniel Bradshaw Comments regarding the Hydrogen Energy California Power Plant Project. Posted: September 8, 2010. (PDF file, 1 pages, 53 kb)

Environmental Defense Fund Petition to Intervene. Posted: September 8, 2010. (PDF file, 8 pages, 3.1 mb)

Mr. Ara Marderosian Second Comment regarding the Hydrogen Energy California Power Plant Project. Posted: September 8, 2010. (PDF file, 21 pages, 1 mb)

San Joaquin Valley Air Pollution Control District's Emission Reduction Credit Package Summary. Posted: September 8, 2010. (PDF file, 6 pages, 246 kb)

Mr. Ara Marderosian First Comment regarding the Hydrogen Energy California Power Plant Project. Posted: September 8, 2010. (PDF file, 5 pages, 242 kb)

Kern County Comments regarding the Hydrogen Energy California Power Plant Project. Posted: September 8, 2010. (PDF file, 3 pages, 82 kb)

Notice of Intent to prepare an Environmental Impact Statement and Notice of Potential Floodplain and Wetland Involvement. Dated: April 14, 2010. Posted: September 8, 2010. (PDF file, 28 pages, 1.7 mb)

Association of Irritated Residents Issues Statement. Dated: March 26, 2010. Posted: September 8, 2010. (PDF file, 4 pages, 135 kb)

Kern-Kaweah Chapter of the Sierra Club Petition to Intervene. Dated: March 3, 2010. Posted: September 8, 2010. (PDF file, 7 pages, 1.8 mb)

DOE Initation of Consoltation Under Section 7 of the ESA. Dated: February 4. Posted: September 8, 2010. (PDF file, 2 pages, 860 kb)

Letter from Occidental Petroleum outlining the CO2 EOR project. Dated: February 2, 2010. Posted: September 8, 2010. (PDF file, 8 pages, 2.8 mb)

National Energy Technology Laboratory regarding the appropriate agency to regulate the use of the carbon dioxide (C02) from the HECA project for EOR and sequestration. Dated January 8, 2010. Posted: September 8, 2010. (PDF file, 2 pages, 766 kb)

Figures and Maps

No Figures and Maps at this time.