Welcome to the California Energy Commission


IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for this proceeding, use the "Documents for this Proceeding (Docket Log)" and other e-filing links on this proceeding's home page.



Santa Clara SC-1 Data Center, Phase 2 Power Plant Licensing Case
Documents Page

Docket Number: 2011-SPPE-1

Most files are Adobe Acrobat Portable Document Format (PDF) files. To download, navigate and print these files you will need the free Acrobat Reader software available from Adobe Systems Incorporated's Web Site.

Some PDF files are very large. Download these directly to your computer's hard drive by "right-clicking" the link to the file (use option-mouse click if on a Macintosh). After the file is downloaded, open it through Acrobat Reader.


Click on heading to go to that section below.

 
 

Commission's Documents

Commission Final Decision. Publication number CEC-800-2012-002-CMF. Posted: March 30, 2012. (PDF file, 141 pages, 2.4 mb).

Errata to the Proposed Decision. Posted: March 22, 2012. (PDF file, 4 pages, 82 kb).

Committee's Proposed Decision. Posted: March 9, 2012. (PDF file, 139 pages, 1.7 mb).

Transcript of the February 22, 2012, Evidentiary Hearing. Posted: February 23, 2012. (PDF file, 18 pages, 31.5 kb).

Conversation from Joey Hughes to Candace Hill Regarding Potential Cooling Tower Plumes Modeling Results. Posted: February 13, 2012. (PDF file, 1 pages, 53.7 kb).

California Energy Commission Staff's Prehearing Conference Statement. Posted: February 10, 2012. (PDF file, 5 pages, 226 kb).

Transcript of the January 26, 2012, Public Informational Hearing. Posted: February 2, 2012. (PDF file, 46 pages, 75.5 kb).

Initial Study and Negative Declaration Recommendation. Posted: February 1, 2012.
(PDF file, 122 pages, 1.6 mb).

Memo Regarding four Xeres Ventures LLC Attached Items. Dated January 23, 2012. Posted: January 24, 2012.
Contains: 1) Email exchange, 2) Revised Distribution Diagram, 3) Uninterrupted Power Supply one-line diagram, 4) Calculation worksheet. (PDF file, 8 pages, 238 kb).




Applicant's Documents

Applicant's Prehearing Conference Statement - Posted February 13, 2012. (PDF file, 10 pages, 883 kb)

Santa Clara SPPE Application - Posted November 23, 2011. (PDF files)


Intervenors' and Others' Documents

None at this time


Figures and Maps

None at this time