Energy Facilities Compliance Monitoring - Projects On-Line Before 1999

Projects that have been certified by the Energy Commission are monitored throughout construction, operation and closure to ensure that the owners comply with all conditions of certification. Additional post-certification compliance activities include processing amendments for changes to projects, handling complaints and processing requests to close projects.

For more information about the Energy Commission's Compliance Monitoring Program, please contact the Commission's Siting, Transmission, and Environmental Protection Division at:

Chris Marxen, Manager
California Energy Commission
Energy Facilities Compliance and Dockets
(916) 651-0587
CMarxen@energy.state.ca.us


Pre-1999 Power Plant Compliance Documents and Notices

For projects that have come on line since 1999, see individual project's page.

Note: Bottle Rock (79-AFC-4C) has been moved to its own separate page.




IMPORTANT NOTE: This page has been superceded by the Energy Commission's e-filing and e-commenting database and is no longer updated. To access documents for any of the Pre-1999 proceedings, use the link below to access the associated Docket log.

Pre-1999 Docket Logs




2013 Items

SEGS VIII Project (88-AFC-1C) - Notice of Receipt of Petition to Amend California Energy Commission Decision to Build a 1600 Sq. Foot Foundation and Single Story Building. (PDF file, 3 page, 135 kb).

SEGS VIII Project (88-AFC-1C) and SEGS IX Project (89-AFC-1C) - Addendum to the Amendment to Change Condition of Certification to Build a Breakroom and Training/Conference Facility. Posted June 28, 2013. (PDF file, 1 page, 78 kb).

Sacramento Power Authority Campbell Cogeneration Project (93-AFC-3C) - Notice of Receipt of Petition to Amend the CEC's Decision for the Sacramento Power Authority Campbell Cogeneration Project. Posted June 19, 2013. (PDF file, 3 pages, 29 kb)

SEGS VIII Project (88-AFC-1C) and SEGS IX Project (89-AFC-1C) - Petition to Amend to Change Condition of Certification to Build a Breakroom and Training/Conference Facility. Posted June 18, 2013. (PDF file, 35 page, 7.7 mb).

Sacramento Power Authority Campbell Cogeneration Project (93-AFC-3C) - Petition for Post Certification License Amendment. Posted May 16, 2013. (PDF file, 17 pages, 451 kb)

Gilroy Cogen Project (84-AFC-4C) - Notice of Decision Approving Petition to Modify the Commission Decision and Install Two New Selective Catalytic Reduction (SCR) Units. Posted April 10, 2013. (PDF file, 1 page, 74 kb)

Gilroy Cogen Project (84-AFC-4C) - California Energy Commission Staff Analysis on Proposed Installation of Two New Selective Catalytic Reduction (SCR) Units one the Project's Two Auxiliary Boilers. Posted March 25, 2013. (PDF file, 16 pages, 74 kb)

Gilroy Cogen Project (84-AFC-4C) - Revised Notice of Receipt - Petition to Amend the California Energy Commission Decision to Install Two Selective Catalytic Reduction Systems. Posted February 22, 2013. (PDF file, 3 pages, 33 kb)

Gilroy Cogen Project (84-AFC-4C) - Petition to Amend the California Energy Commission Decision to Install Two Selective Catalytic Reduction Systems. Posted February 22, 2013. (PDF file, 11 pages, 479 kb)




2012 Items

Gilroy Cogen Project (84-AFC-4C) - Notice of Receipt - Petition to Amend the California Energy Commission Decision for the Gilroy Cogen Project. Posted December 13, 2012. (PDF file, 3 pages, 800 kb)

Gilroy Cogen Project (84-AFC-4C) - Petition to Amend the California Energy Commission Decision requesting approval to install Selective Catalytic Reduction (SCR). Posted December 12, 2012. (PDF file, 11 pages, 496 kb)

Crockett Cogeneration Project (92-AFC-01) - Satisfaction of Pre-Construction and Construction Conditions of Certification for the Installation of Natural Gas Compression Equipment. Dated October 24, 2012, posted November 1, 2012. (PDF file, 2 pages, 20 kb).

Calpine King City Cogen, LLC (85-AFC-5C) - Petition to Amend the Energy Commission Decision. Dated September 20, 2012. Posted October 5, 2012. (PDF file, 24 pages, 729 kb)

SEGS VIII Project (88-AFC-1C) and SEGS IX Project (89-AFC-1C) - Notice of Determination, to Add New Foundation and Containment Structure for a Spare Transformer. Posted September 25, 2012. (PDF file, 2 pages, 41 kb).

SEGS III-VII Project (87-AFC-1C) - Notice of Determination Petition to Add New Foundation and Containment Structure for a Spare Transformer. Posted September 25, 2012. (PDF file, 2 pages, 45 kb).

SEGS VIII Project (88-AFC-1C) and SEGS IX Project (89-AFC-1C) - Addendum to Amendment to Change Condition of Certification Modifying the Original Size Listings for the Foundation and Containment Structure. Posted August 15, 2012. (PDF file, 1 page, 168 kb).

SEGS III Project (87-AFC-1C) - Addendum to Amendment to Change Condition of Certification Modifying the Original Size Listings for the Foundation and Containment Structure. Posted August 15, 2012. (PDF file, 1 page, 164 kb).

SEGS III Project (87-AFC-1C) - Petition to Amend - NextEra Energy is proposing to construct a foundation and containment structure for storage of a spare main power transformer. Posted June 22, 2012. (PDF file, 6 page, 2.4 mb).

SEGS VIII Project (88-AFC-1C) - Petition to Amend - NextEra Energy is proposing to construct a foundation and containment structure for storage of a spare main power transformer. Posted June 22, 2012. (PDF file, 6 page, 2.4 mb).

SEGS IX Project (89-AFC-1C) - Petition to Amend - NextEra Energy is proposing to construct a foundation and containment structure for storage of a spare main power transformer. Posted June 22, 2012. (PDF file, 6 page, 2.4 mb).

Crockett Cogeneration Project (92-AFC-01) - Notice of Decision for Modifications. Posted March 29, 2012. (PDF file, 1 page, 66 kb).

Crockett Cogeneration Project (92-AFC-01) - Order Approving the Petition to Amend the Crockett Cogeneration Project to Allow Installation of Electric Motor-Driven Natural Gas Compression Equipment. Posted March 27, 2012. (PDF file, 2 pages, 48 kb).

Crockett Cogeneration Project (92-AFC-01) - Project Owner's Comment on the Staff Analysis of Petition to Amend. Posted March 5, 2012. (PDF file, 2 pages, 90.5 kb).

Crockett Cogeneration Project (92-AFC-01) - California Energy Commission Staff's Corrected Analysis of Proposed Modification to allow Installation of Electric Motor-Driven Natural Gas Compression Equipment. Posted January 31, 2012. (PDF file, 7 pages, 152 kb).

Crockett Cogeneration Project (92-AFC-01) - California Energy Commission Staff's Analysis of Proposed Modification to allow Installation of Electric Motor-Driven Natural Gas Compression Equipment. Posted January 30, 2012. (PDF file, 7 pages, 152 kb).

Crockett Cogeneration Project (92-AFC-01) - Petition to Amend the CEC Final Decision Modifying the Crockett Cogeneration Project, Supplemental Data. Posted January 23, 2012. (PDF file, 10 pages, 4.02 mb).

Crockett Cogeneration Project (92-AFC-01) - Notice of Receipt of Petition to Amend, to modify the Crockett Cogeneration Project by installing electric motor driven natural gas compression equipment. Posted January 13, 2012. (PDF file, 3 pages, 33.5 kb).




2011 Items

Crockett Cogeneration Project (92-AFC-01) - Petition to Amend, to modify the Crockett Cogeneration Project by installing electric motor driven natural gas compression equipment. Dated December 21, 2011. Posted January 4, 2012. (PDF file, 279 pages, 4.6 mb).

Kern River Cogeneration Company (82-AFC-2C) - Notice of Decision for modifying Air Quailty Conditions of Certification, AQ-17 & AQ-18, to include 12-hour start-up period. Posted: December 5, 2011. (PDF file, 1 pages, 222 kb).

Sycamore Cogeneration Company (84-AFC-6C) - Notice of Decision for modifying Air Quailty Conditions of Certification, AQ-18 & AQ-19, to include 12-hour start-up period. Posted: December 5, 2011. (PDF file, 1 pages, 220 kb).

Kern River Cogeneration Company (82-AFC-2C) - Order approving a petition to modify Air Quailty Conditions of Certification to include 12-hour start-up period. Posted: December 1, 2011. (PDF file, 4 pages, 168 kb).

Sycamore Cogeneration Company (84-AFC-6C) - Order approving a petition to modify Air Quailty Conditions of Certification to include 12-hour start-up period. Posted: December 1, 2011. (PDF file, 4 pages, 168 kb).

Kern River Cogeneration Company (82-AFC-2C) - Revised Letter - Staff will recommend approval of petition at the November 30, 2011, Business Meeting. Posted: November 1, 2011. (PDF file, 2 pages, 24 kb).

Sycamore Cogeneration Company (84-AFC-6C) - Revised Letter - Staff will recommend approval of petition at the November 30, 2011, Business Meeting. Posted: November 1, 2011. (PDF file, 2 pages, 25 kb).

Kern River Cogeneration Company (82-AFC-2C) - Staff Analysis of Proposed Modifications to Operate the Combustion Gas Turbine Units in an Extended Startup Mode. Posted: October 13, 2011. (PDF file, 8 pages, 33 kb).

Sycamore Cogeneration Company (84-AFC-6C) - Staff Analysis of Proposed Modifications to Operate the Combustion Gas Turbine Units in an Extended Startup Mode. Posted: October 13, 2011. (PDF file, 8 pages, 33 kb).

Kern River Cogeneration Company (82-AFC-2C) - Notice of Receipt, Petition to Amend the Energy Commission Decision. Dated August 4, 2011. Posted: October 6, 2011. (PDF file, 3 pages, 61 kb).

Sycamore Cogeneration Company (84-AFC-6C) - Notice of Receipt - Petition to Amend the California Energy Commission Decision. Dated August 2, 2011. Posted: August 4, 2011. (PDF file, 3 pages, 56 kb).

SEGS VIII Project (88-AFC-1C) - Approval of Requested Modification to Add Additional Loops Within the Plant Boundary. Dated July 18, 2011. Posted: July 22, 2011. (PDF file, 2 pages, 25 kb).

Kern River Cogeneration Company (82-AFC-2C) - Petition For Insignificant Amendment. Dated July 11, 2011. Posted: July 22, 2011. (PDF file, 60 pages, 1.54 MB).

Sycamore Cogeneration Company (84-AFC-6C) - Petition For Insignificant Amendment. Dated July 11, 2011. Posted: July 22, 2011. (PDF file, 60 pages, 1.68 MB).

SEGS VIII Project (88-AFC-1C) - Notice of Determination on Petition to Add Additional Loops Within the Plant Boundary for the Segs VIII Project. Dated June 29, 2011. Posted: June 30, 2011. (PDF file, 2 pages, 25 kb).

Calpine King City Cogen, LLC (85-AFC-5C) - Notice of Receipt: Petition to Amend the Energy Commission Decision for the Calpine King City Cogen Project. Posted April 27, 2011. (PDF file, 3 pages, 106 kb)

Midway Sunset Cogeneration Project (85-AFC-3C) - Order Approving A Petition to Replace Unit B Dry Low Nitrogen Oxide Combustion Equipment and Modify Air Quality Conditions Of Certification. Posted April 21, 2011. (PDF file, 8 pages, 209 kb)

Gilroy Cogen Project (84-AFC-4C) - Order Approving Petition to Install Dry Low Nitrogen Oxide Combuster Unit. Posted April 21, 2011. (PDF file, 5 pages, 211 kb)

Calpine King City Cogen, LLC (85-AFC-5C) - Pettition to Amend Commission Decision Conditions of Certification. Posted April 20, 2011. (PDF file, 49 page, 2.6 mb)

Gilroy Cogen Project (84-AFC-4C) - Notice of Decision by the California Energy Commission. Posted April 20, 2011. (PDF file, 1 page, 220 kb)

Midway Sunset Cogeneration Project (85-AFC-3C) - Notice of Decision by the California Energy Commission. Posted April 20, 2011. (PDF file, 1 page, 220 kb)

Calpine Gilroy Cogen Project (84-AFC-4C) - Letter to Interested Parties and Staff Analysis of Installation of Dry Low NOx (DLN+) Combusters. Posted February 25, 2011. (PDF file, 9 pages, 39 kb)

Midway Sunset Cogeneration Project (85-AFC-3C) - Revised Letter to Interested Parties regarding Staff Analysis of Proposed Modifications. The date of the business meeting considering approval of this petition has changed to April 6, 2011. Posted February 25, 2011. (PDF file, 2 pages, 17 kilobytes)

SEGS VIII Project (88-AFC-1C) - NextEra Energy's Request for an Amendment to Construct Additional Loops Within the Plant Boundary. Posted: February 14, 2011. (PDF file, 4 pages, 1.1 MB).

Midway Sunset Cogeneration Project (85-AFC-3C)- Staff Analysis of Proposed Modification. Posted January 25, 2011. (PDF file, 8 pages, 37 kilobytes)




2010 Items

Midway Sunset Cogeneration Project (85-AFC-3C) - Notice of Receipt - Petition to Amend CEC Decision with Proposed Modifications. Posted December 7, 2010. (PDF file, 3 pages, 78 kilobytes)

Midway Sunset Cogeneration Project (85-AFC-3C) - Modification for Post Certification Amendments. Amendments for Units A, B & C. Posted November 19, 2010. (PDF file, 8 pages, 3.9 megabytes)

Midway Sunset Cogeneration Project (85-AFC-3C) - Post Certification Amendments for Units A, B & C
(Administrative Changes to Unit A & C Administrative Changes to Unit B Plus Revising Unit B's DLN9 Combustion System to a DLN1+ Combustion System). Posted October 26, 2010. (PDF file, 21 pages, 1 MB)

Calpine Gilroy Cogen Project (84-AFC-4C) - Notice of Receipt, Petition to Amend the Energy Commission Decision. Posted October 19, 2010. (PDF file, 3 pages, 50 kb)

Sonoma Geothermal Project (80-AFC-1C) - Notice of Decision by the California Energy Commission. The Commission approves project change. Dated September 23, 2010. (PDF file, 1 page, 29 kb)

Calpine Gilroy Cogen Project (84-AFC-4C) - Amendment Application for Modifications to Comply With Bay Area Air Quality Management District Regulation 9 Rule 9 for Gas Turbines . Posted September 20, 2010. (PDF file, 28 pages, 518 kb)

Sonoma Geothermal Project (80-AFC-1C) - Order Approving Termination of the MOU and LOU between the California Energy Commission and the United States Geological Survey; and Amendment of the Final Decision . Dated August 25, 2010. Posted September 16, 2010. (PDF file, 3 pages, 126 kb)

Sonoma Geothermal Project - USGS Letter requesting termination of 1981 MOU and change in Primary Compliance Monitoring Agency. Dated May 24, 2010. (PDF file, 7 pages, 158 kb)

NCPA-2 Power Plant (79-AFC-2C) - USGS Letter Regarding Compliance Oversight of the NCPA-2 Power Plant. Dated February 1, 2010. (PDF file, 1 page, 44 kb)




2009 Items

Sacramento Power Authority Campbell Cogeneration Project (93-AFC-3C) - Order Approving a Petition to Amend the Air Quality Conditions of Certification. Posted September 2, 2009. (PDF file, 37 pages, 1.2 mb)

Sacramento Power Authority Campbell Cogeneration Project (93-AFC-3C) - Notice of Decision by the California Energy Commission Regarding Filing Notice of Decision in Compliance for the Sacramento Power Authority Campbell Cogen Project. Posted August 28, 2009. (PDF file, 1 page, 29.2 kb)

Sacramento Power Authority Campbell Cogeneration Project (93-AFC-3C) - Staff Analysis of Proposed Modifications to Air Quality Conditions of Certification. Posted July 23, 2009. (PDF file, 37 pages, 825 kb)

SMUD Cogeneration Pipeline Project (92-AFC-2PC) - Approval of Requested Modification to Relocate Approximately 150 Feet of Natural Gas Pipeline. Posted: July 13, 2009. (PDF file, 1 page, 59.9 kb).

SMUD Cogeneration Pipeline Project (92-AFC-2PC) - Notice of Receipt of Petition to Amend The Energy Commission Certification Decision Natural Gas Pipeline Relocation. Posted: June 25, 2009. (PDF file, 2 pages, 104 kb).

SMUD Cogeneration Pipeline Project (92-AFC-2PC) - Petition for Post Certification Project Modification. Posted: May 12, 2009. (PDF file, 174 pages, 5.7 mb).

SEGS VIII & IX Project (88-AFC-1C) - FPL Energy's Petition to Construct a New Building Within the Plant Boundary. Posted: April 28, 2009. (PDF file, 2 pages, 100 kb).

SMUD Cogeneration Pipeline Project (92-AFC-2P) Approval of Staff Approved Project Modification to upgrade the pipeline facilities.
Posted: April 16, 2009. (PDF file, 1 page, 16 kb).

Sacramento Power Authority Campbell Cogeneration (93-AFC-3C) - Responses to Data Request 1 to 5 for Amendment 2009-1 to the Conditions of Certification. Posted: April 6, 2009. (PDF file, 23 pages, 4.25 mb).

SMUD Cogeneration Pipeline Project (92-AFC-2P) Notice of Receipt to Upgrade Pipeline Facilities
Posted: March 30, 2009. (PDF file, 2 pages, 261 kb).

Sacramento Power Authority Campbell Cogeneration Project (93-AFC-3C) Amendment 2009-1 Data Requests 1 to 5
Posted: March 11, 2009. (PDF file, 3 pages, 108 kb).

Sacramento Power Authority Campbell Cogeneration (93-AFC-3C) - Notice of Receipt of Petition to Amend Conditions of Certification. Posted: February 27, 2009. (PDF file, 3 pages, 140 kb).

SMUD Cogeneration Pipeline Project (92-AFC-2PC) - Campbell Cogen Measurement & Regulation Station Improvement Project. Posted: February 24, 2009. (PDF file, 7 pages, 1.4 mb).

Sacramento Power Authority Campbell Cogeneration (93-AFC-3C) - Errata to Petition to Amend Conditions of Certification. Posted: February 24, 2009. (PDF file, 2 pages, 400 kb).

Sacramento Power Authority Campbell Cogeneration (93-AFC-3C) - Petition to Amend Conditions of Certification, Add New Air Quality Conditions for a Commissioning Period, Amend Existing Condition AQ-11, 15, 19 & 31. Posted: February 11, 2009. (PDF file, 89 pages, 10.8 mb).




2008 Items

Procter & Gamble (93-AFC-2C) - Order Approving Petition a to Upgrade Three Combustion Turbines. Posted: September 8, 2008. (PDF file, 8 pages, 126 kb).

Geysers Power Company (81-AFC-1C) - Notice of Decision on Amendment to Change Condition of Certification, Biological Resources 5-4, to Allow Suspension of Boron Monitoring. Posted: July 18, 2008. (PDF file, 1 page, 56 kb).

Geysers Power Company (81-AFC-1C) - Notice Of Receipt Of Petition To Amend The Energy Commission Decision To Modify Biological Resources Condition Of Certification Bio 5-4 Regarding Boron Drift Monitoring, And Public Review Of The Staff Analysis. Posted: May 23, 2008.

Geysers Power Company (81-AFC-1C) - Petition Amendment to Modify biological Certification. (PDF file, 24 pages, 1.96 mb)(The company has asked that we withdraw the original petition to amend and replace it with this new one). Posted: May 5, 2008.

High Desert Power Project (97-AFC-1C) - California Energy Commission Staff Analysis Petition of Proposed Modification of Air Quality Conditions Relating to Source Test Intervals and Other Administrative Changes. Posted: April 9, 2008. (PDF file, 7 pages, 97.4 kb).

Kern River Cogeneration Company (82-AFC-2) - Notice of Receipt of Petition to Amend - Air Quality. (Acrobat PDF file). Posted: March 13, 2008.

Kern River Cogeneration Company (82-AFC-2) - Staff Analysis of Petition to Amend - Upgrade Emission Controls. (Acrobat PDF file). Updated: March 26, 2008.

Sycamore Cogeneration Company (84-AFC-6) - Notice of Receipt of Petition to Amend - Air Quality. (Acrobat PDF file). Posted: March 13, 2008.

Sycamore Cogeneration Company (84-AFC-6) - Staff Analysis of Petition to Amend - Upgrade Emission Controls. (Acrobat PDF file). Updated: March 27, 2008.

Procter & Gamble (93-AFC-2C). - Staff Analysis of Proposed Upgrade of Three Gas Combustion Turbines. (PDF file. 21 pages. 496 kb) Posted: February 29, 2008.

Procter & Gamble (93-AFC-2C). - Notice of Receipt of Petition to Upgrade Three Gas Combustion Turbines. (PDF file. 3 pages, 114 kb) Posted: February 29, 2008.

Sycamore Cogeneration Company (84-AFC-6) - Petition to Amend - Water Supply. (Acrobat PDF file. 6 pages, 107 kb). Posted: January 4, 2008.

Sycamore Cogeneration Company (84-AFC-6) - CEC notice of receipt of Petition to Amend. (Acrobat PDF file. 2 pages, 32 kb). Posted: January 4, 2008.




2007 Items

Procter & Gamble (93-AFC-2C). - Petition for Post Certification Modification to Construct LM6000 Turbine Upgrades. (PDF file. 90 pages, 1.99 mb, Note File Size) Posted: December 11, 2007.

Order Approving a Petition to Increase Ammonia Slip (85-AFC-3C). - The Midway Sunset Cogeneration Company (MSCC), request to modify the facility by increasing the amount of unreacted ammonia into the stack emissions has been approved. (PDF file. 2 pages, 20 KB) Posted: November 1, 2007.

SMUD Cogeneration Project (92-AFC-2P) - Approval of Insignificant Project Change to Relocate a 3,200 Foot Section of the SMUD Cogeneration Pipeline. (PDF file. 1 page, 28 KB) Posted: September 14, 2007.

Kern River Cogeneration Company (82-AFC-2) - Petition to Amend - Air Quality. (Acrobat PDF file). Posted: September 11, 2007.

Sycamore Cogeneration Company (84-AFC-6) - Petition to Amend - Air Quality. (Acrobat PDF file). Posted: September 11, 2007.

SMUD Cogeneration Project (92-AFC-2P) - Notice of Insignificant Project Change to Relocate a 3,200 Foot Section of the SMUD Cogeneration Pipeline. Posted: August 23, 2007.

SMUD Cogeneration Project (92-AFC-2P) - Petition for Insignificant Project Modification - Natural Gas pipeline Relocation. (PDF file. 71 pages, 8.4 mb, Note File Size). Posted: August 23, 2007.

Midway Sunset Cogeneration Project (85-AFC-3C) - Staff Analysis of Request to Increase Ammonia Slip. (PDF file. 5 pages, 117.3 kb). Posted: August 10, 2007.

Midway Sunset Cogeneration Project (85-AFC-3C) - Notice of Receipt of Amendment Petition to Increase Ammonia Slip. (PDF file. 3 pages, 68.2 kb). Posted: August 10, 2007.

Midway Sunset Cogeneration Project (85-AFC-3C) - Amendment Petition to Increase Ammonia Slip. (Acrobat PDF files). Posted: July 11, 2007.

Richmond Cogeneration Facility (86-SPPE-1) - Order Granting Chevron's Petition to Remove Limitation on Sales of Excess Power. Posted: June 15, 2007. (PDF file, 3 pages, 76 kb).

Richmond Cogeneration Facility (86-SPPE-1) - PG&E's Non-Opposition to Chevron's Petition to Remove Limitation on Sales of Excess Power. Posted: May 25, 2007. (PDF file, 1 page, 205 kb).

Richmond Cogeneration Facility (86-SPPE-1) - Notice of Receipt - Petition to Remove Limits on Surplus Electric Generation. Posted: May 10, 2007. (PDF file, 3 pages, 36.9 kb).

Richmond Cogeneration Facility (86-SPPE-1) - Staffs Response to Petition and Supplemental petition to Modify Small Power Plant Exemption to Remove Limitation on Sales of Excess Power. Posted: May 8, 2007. (PDF file, 8 pages, 231 kb).

Richmond Cogeneration Facility (86-SPPE-1) - Petition to Modify Small Power Plant Exemption to Remove Limitation on Sales of Excess Power. Posted: May 8, 2007. (PDF file, 12 pages, 84 kb).

Supplement to Petition - To Modify Small Power Plant Exemption to Remove Limitation on Sales of Excess Power. Posted: May 8, 2007. (PDF file, 22 pages, 548 kb).





2006 Items

Bottle Rock Geothermal Power Plant (79-AFC-4C) - Order Approving the Change of Ownership, The restart of Operation After Suspension, and 11 Facility Design Changes. (PDF file, 48 pages, 212 kb). Dated: December 13, 2006. Posted: May 20, 2008.

Midway Sunset Cogeneration Project (85-AFC-3C) - Staff Analysis of Proposed Modifications to Install a New Evolution Compressor Rotor in the Unit A Turbine. Posted: September 13, 2006. (PDF file, 10 pages, 84 kb).

Midway Sunset Cogeneration Project (85-AFC-3C) - Notice Of Receipt Petition To Amend The Energy Commission Decision. Posted: August 24, 2006.

Midway Sunset Cogeneration Project (85-AFC-3C) - Post Certification Amendment to Install an Evolution Rotor in Unit A. Posted: August 4, 2006. (PDF file, 63 pages, 19.7 mb).

Sycamore Cogeneration Project (84-AFC-6C) - Notice of Insignificant Project Change to Allow Either Simple Cycle or Cogeneration Operation of Units 2 and 3. Posted: July 12, 2006. (PDF file, 2 pages, 32 kb).

Sycamore Cogeneration Project (84-AFC-6C) - RE: Petition for Insignificant Amendment. Posted: July 12, 2006. (PDF file, 151 pages, 23.8 mb).

Kern River Cogen, (82-AFC-2C) - Notice of Insignificant Project Change to Allow The Replacement of The Dry Low Nox Combustors in Units 2 and 4 With Enhanced Dry Low Nox Combustors (DLN1+). Posted: July 7, 2006. (PDF file, 2 pages, 30 kb).

Kern River Cogen, (82-AFC-2C) - Petition for Insignificant Air Quality Amendment. Dated June 22, 2006. Posted: July 7, 2006. (PDF file, 66 pages, 5.5 mb).

High Desert Power Project, LLC (97-AFC-1C) - Comments on Staff Analysis to Amend Condition of Certification S&W-4. Dated June 26, 2006, 2006. (PDF file, 27 pages, 400 kb).

High Desert Power Project, LLC (97-AFC-1C) - Addendum 2 to Petition for Revisions/Administrative Changes to Soil & Water - 4 Commission Decision. Posted: April 4, 2006. (PDF file, 27 pages, 400 kb).

High Desert Power Project, LLC (97-AFC-1C) - Addendum 1 to Petition for Revisions/Administrative Changes to Soil & Water - 4 Commission Decision. Posted: April 4, 2006. (PDF file, 37 pages, 1.46 mb).

Kern River Cogen, (82-AFC-2C) - Notice of Insignificant project change to allow Either Simple Cycle or Cogeneration Operation. Dated: February 03, 2006. Posted: February 03, 2006. (PDF file, 2 pages, 28 kb).

Kern River Cogen, (82-AFC-2C) - Petition to Allow Units 1 & 2 to Operate in Either Cogen or Simple Cycle mode. Dated: December 16, 2005. Posted: January 23, 2005. (PDF file, 176 pages, 22.3 mb).




2005 Items

Calpine King City Cogen - Order No. 05-0713-01(c) Order Approving Modifications to Air Emission Monitoring Requirements. Dated: July 15, 2005. Posted: December 28, 2005. (PDF file, 3 pages, 36 kb).

Calpine Gilroy Cogen - Order No. 05-0713-01(b) Order Approving Modifications to change the source of power plant cooling water to recycled wastewater. Dated: July 15, 2005. Posted: December 28, 2005. (PDF file, 3 pages, 36 kb).

Luz Solar Partners Ltd., VIII and IX's SEG IX Project - Order No. 05-1103-02 - Order Approving a Petition to Amend Biological Resources Condition BIO-11.k Posted: December 15, 2005. (PDF file, 2 pages, 92 kb).

High Desert Power Project, LLC (97-AFC-1C) Petition for Revisions/Administrative Changes to Soil & Water - 4 Commission Decision. Dated September 30, 2005. Posted: October 13, 2005. (PDF file, 10 pages, 304 kb).

SEGS IX Project (89-AFC-1C) - Notice of Receipt to Modify Condition of Certification BIO-11.k. Staff's Analysis for Public Review. Posted: October 13, 2005. (PDF file, 7 pages, 252 kb).

Solar Electric Generating Station (SEGS) VIII and IX Projects - Petition for change in Condition of Certification Marsh Restoration Conditions BIO-11.k. Posted: September 7, 2005. (PDF file, 21 page, 560 kb).

Calpine King City Cogen Project (85-AFC-5C) - Staff Analysis of Modifications to Air Emission Monitoring Requirements. Posted: June 21, 2005. (PDF file, 6 page, 144 kb).

Calpine Gilroy Cogen Project (84-AFC-4C) - Staff Analysis of Proposed Modifications to Change the Source of Cooling Water from Well Water to Recycled Water . Posted: June 21, 2005. (PDF file, 12 page, 164 kb).

Bottle Rock Power Plant (79-AFC-4C) - Order Approving an Extension of the Environmental Monitoring Program During Suspended Operations. Posted: June 8, 2005. (PDF file, 10 page, 90 kb).

Kern River Cogeneration Project (82-AFC-2C) - Notice of Significant Project Change - Addition of Above-Ground Natural Gas Pipeline. Posted: June 6, 2005. (PDF file, 2 page, 84 kb).

Kern River Cogeneration Company (82-AFC-2C) - RE: Installation of Gas Pipeline for Simple Cycle Units. Posted: June 6, 2005. (PDF file, 10 page, 100kb).

Calpine King City Cogen (85-AFC-5C) - Notice of Receipt, Petition to Amend the Energy Commission Decision. Posted: May 11, 2005. (PDF file, 3 page, 24 kb).

Calpine King City Cogen (85-AFC-5C) - RE: Petition to Amend Commission Decision Conditions of Certification. Posted: May 11, 2005. (PDF file, 7 page, 210 kb).

Calpine Gilroy Cogen Project (84-AFC-4C) - Notice of Receipt, Petition to Amend the Energy Commission Decision. Posted: May 11, 2005. (PDF file, 3 page, 24 kb).

Calpine Gilroy Cogen Project (84-AFC-4C) - Amendment No 1, Recycled Water for Cooling Purposes. Posted: May 11, 2005. (PDF file, 19 page, 560 kb).

Bottle Rock Geothermal Power Plant (79-AFC-4C) - post-certification Compliance Proceedings. Posted: April 14, 2005. (PDF file, 12 page, 264kb).

Luz Solar Partners III, IV, V, VI & VIIs, SEGS III-VII PROJECT - Order No. 05-0216-01(d) ORDER APPROVING Transfer of operational control to FPL Energy Operating Services, Inc. Posted: March 18, 2005.

Solar Electric Generating Facilities (SEGS III - VII) (87-AFC-1C) - Operator Change - Information Request Form. Posted: January 28, 2005. (PDF file, 1 page, 88 kb).

Solar Electric Generating Facilities (SEGS III - VII) (87-AFC-1C) - Notice of Receipt: Request for Change of Operator, dated January 28, 2005. Posted: January 28, 2005. (PDF file, 1 page, 92 kb).

Solar Electric Generating Facilities (SEGS III - VII) (87-AFC-1) - Request for Change of Operator, dated January 5, 2005. Posted: January 27, 2005. (PDF file, 1 page, 44 kb).

Bottle Rock Power Plant (79-AFC-4C) - Notice of Receipt - Petition to Amend the Energy Commission Decision for the Bottle Rock Geothermal Power Project (79-AFC-4C) Extension Of Environmental Monitoring Program For Suspended Operations. Posted: January 26, 2005. (PDF file, 3 pages, 140 kb).

Bottle Rock Power Plant (79-AFC-4C) - Petition for Extending Environmental Monitoring Program Posted: January 26, 2005. (PDF file, 26 pages, 108 kb).




2004 Items

Sycamore Cogeneration Project (84-AFC-6C) - Order Approving Operation in Either Cogeneration or Simple Cycle Mode, and Extending the License to Operate. Posted: December 27, 2004. (PDF file, 5 pages, 32 kb).

Sycamore Cogeneration Project (84-AFC-6C) - Staff Analysis of Proposed Modifications to Allow Either Cogen or Simple-Cycle Operations and Extending the License to Operate. Posted: November 02, 2004. (PDF file, 11 pages, 184 kb).

Sycamore Cogeneration Project (84-AFC-6C) - Petition for Minor Amendment. Posted: October 22, 2004. (PDF file, 221 pages, 13 mb). NOTE: Some browsers may have difficulty displaying a file of this size. It is best to first download large files directly to your hard drive by right-clicking on the above link, then open in Acrobat.

Sycamore Cogeneration Project (84-AFC-6C) - Notice of Receipt, Petition to Amend the Energy Commission Decision. Posted: August 26, 2004.

Information Request Form. Date On-line - August 26, 2004. (PDF file, 1 page, 7 kb).

Kern River Cogen Project (82-AFC-2C) Post-Certification Compliance Proceeding - Order Approving a Petition to Allow for Either Cogen or Simple-Cycle Operation. Posted: April 26, 2004. (PDF file, 5 pages, 30 kb).

Kern River Cogen Project (82-AFC-2C) Post-Certification Compliance Proceeding - Public Review of Staff Analysis of Proposed Modification to allow either Cogen or Simple Cycle Operations. Posted: March 08, 2004. (PDF file, 14 pages, 58 kb).

Geysers Units 3, 16, 17, 18, 19, and 20 Geothermal Power Plants - Notice of Insignificant Project Change to Allow for Use of Reclaimed Wastewater. Posted: February 20, 2004.

Kern River Cogeneration Project Power Plant (82-AFC-2C) - Petition for Minor Air Quality Amendment to Commission Decision on the Kern River Cogeneration Project Power Plant. Date On-Line - January 20, 2004. (PDF file, 197 pages, 15.5 mb - Note file size!)




2003 Items

Kern River Cogeneration Project Power Plant (82-AFC-2C) - NOTICE OF RECEIPT. Petition to Amend The Energy Commission Decision. Date On-Line - December 30, 2003.

Information Request Form. Date On-line - December 30, 2003. (PDF file, 1 page, 92 kb).

Redding Peaking Power Plant (92-SPPE-2C) - Staff Analysis of Proposed Modification to Allow for an Increase in Operating Hours. Date on line - December 19, 2003. (PDF file, 16 pages, 91 kb).

Redding Peaking Power Plant (92-SPPE-2) - Notice of Receipt of Petition to Amend the Energy Commission Decision. Date on line - December 2, 2003.

Information Request Form. (PDF file, 1 page, 40 kb)

Redding Peaking Power Plant (92-SPPE-2) - Request for a Post Certification Amendment. This post certification amendment is requested to make permanent the California Energy Commission (Commission) May 17, 2001 "Approval of Request to Remove Energy Production Restrictions". Date on line - November 25, 2003. (PDF file, 9 pages, 36 kb).

Bottle Rock Geothermal Power Plant (79-AFC-4C) - Notice Of Receipt - Request for Ownership Change. Date on line - October 29, 2003.

Information Request Form (PDF file, 1 page, 40 kb)